You don't have javascript enabled. Good luck with that.
Pencarian
Cegah Genangan, Kali Petukangan Dikeruk

Petukangan River in Rawa Terate Dredged

East Jakarta Water Resources Sub-dept. dredges mud sedimentation and trash in Petukangan River, Rawa Terate, Cakung. This is done to increase river capacity.

I t is targeted this dredging can be finished in the end of April

"It is dredged for about 300 meters long, starting from Rawa Terate water gate to Krama Yudha Building's backside. It was dredged for one meter depth," said Yoserizal, Maintenance Section Head of East Jakarta Water Resources Sub-dept., Tuesday (4/4).

According to him, that river has already silted up. Thus in high intensity rain, it can not accommodate much water.

Utan Kayu River Dredged

"We deploy one mini amphibious excavator and one long arm in land. It is targeted this dredging can be finished in the end of April," he closed.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye885 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye597 personAldi Geri Lumban Tobing
  3. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye574 personDessy Suciati
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye562 personFakhrizal Fakhri
  5. Fire Site in Utan Kayu Utara Being Cleared

    access_time11-08-2026 remove_red_eye422 personNurito