You don't have javascript enabled. Good luck with that.
Pencarian
Minimalisir Genangan, Pemkot Jakut Keruk Kali Petukangan Sepanjang 1.600 Meter

Kali Petukangan Dredged Along 1.6 Kilometers

North Jakarta Water Resource Sub-dept. dredged Kali Petukangan in Pegangsaan Dua Urban Village, Kelapa Gading. Two unit of excavators were deployed to speed up dredging.

Mud was really dense. When raining, water can overflow easily and flooded residents

"Mud was really dense. When raining, water can overflow easily and flooded residents," said Herning Wahyuningsih, North Jakarta Water Resource Sub-dept. head, Thursday (1/19).

According to Herning, dredging process is planned along 1.6 kilometers. This will add three meters depth to Kali Petukangan which have 13 meters wide.

Petukangan Channel Normalization is Still Reviewed

"Through this effort, it can load more water in rainy season. So, we can anticipate flood at RW 09 area of Pegangsaan Dua urban district and RW 016, 09, 10, and 07 area of Kelapa Gading Timur," he closed.

Linked News
Popular News indeks
  1. South Jakarta Strengthens Efforts to Boost Regional Tax Revenue

    access_time15-06-2026 remove_red_eye359 personTiyo Surya Sakti
  2. Education Agency: Student Admissions to be Objective, Transparent, and Inclusive

    access_time15-06-2026 remove_red_eye356 personAldi Geri Lumban Tobing
  3. 54 Vehicles Undergo Free Emissions Testing at Mitra Praja Sunter

    access_time15-06-2026 remove_red_eye347 personAnita Karyati
  4. Don't Miss the Glodok Chinatown Night Culinary Event This Saturday!

    access_time15-06-2026 remove_red_eye340 personBudhi Firmansyah Surapati
  5. Rano Flags Off 8,200 Runners at BTN JAKIM 2026

    access_time14-06-2026 remove_red_eye339 personBudhi Firmansyah Surapati