You don't have javascript enabled. Good luck with that.
Pencarian
Minimalisir Genangan, Pemkot Jakut Keruk Kali Petukangan Sepanjang 1.600 Meter

Kali Petukangan Dredged Along 1.6 Kilometers

North Jakarta Water Resource Sub-dept. dredged Kali Petukangan in Pegangsaan Dua Urban Village, Kelapa Gading. Two unit of excavators were deployed to speed up dredging.

Mud was really dense. When raining, water can overflow easily and flooded residents

"Mud was really dense. When raining, water can overflow easily and flooded residents," said Herning Wahyuningsih, North Jakarta Water Resource Sub-dept. head, Thursday (1/19).

According to Herning, dredging process is planned along 1.6 kilometers. This will add three meters depth to Kali Petukangan which have 13 meters wide.

Petukangan Channel Normalization is Still Reviewed

"Through this effort, it can load more water in rainy season. So, we can anticipate flood at RW 09 area of Pegangsaan Dua urban district and RW 016, 09, 10, and 07 area of Kelapa Gading Timur," he closed.

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1052 personFakhrizal Fakhri
  2. Pramono Encourages Residents to Stay Active at Rasuna Said CFD

    access_time26-07-2026 remove_red_eye636 personFolmer
  3. Jakarta Partners with Five Satellite Cities for Greater Jakarta Connected Initiative

    access_time30-07-2026 remove_red_eye567 personBudhi Firmansyah Surapati
  4. Pramono Praises Young Innovators at the Jakarta Robotic Games 2026

    access_time28-07-2026 remove_red_eye453 personDessy Suciati
  5. Various Events Prepared for Jakarta`s 5th Century Anniversary

    access_time29-07-2026 remove_red_eye452 personFakhrizal Fakhri