You don't have javascript enabled. Good luck with that.
Pencarian
Minimalisir Genangan, Pemkot Jakut Keruk Kali Petukangan Sepanjang 1.600 Meter

Kali Petukangan Dredged Along 1.6 Kilometers

North Jakarta Water Resource Sub-dept. dredged Kali Petukangan in Pegangsaan Dua Urban Village, Kelapa Gading. Two unit of excavators were deployed to speed up dredging.

Mud was really dense. When raining, water can overflow easily and flooded residents

"Mud was really dense. When raining, water can overflow easily and flooded residents," said Herning Wahyuningsih, North Jakarta Water Resource Sub-dept. head, Thursday (1/19).

According to Herning, dredging process is planned along 1.6 kilometers. This will add three meters depth to Kali Petukangan which have 13 meters wide.

Petukangan Channel Normalization is Still Reviewed

"Through this effort, it can load more water in rainy season. So, we can anticipate flood at RW 09 area of Pegangsaan Dua urban district and RW 016, 09, 10, and 07 area of Kelapa Gading Timur," he closed.

Linked News
Popular News indeks
  1. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1309 personAldi Geri Lumban Tobing
  2. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1214 personAldi Geri Lumban Tobing
  3. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye1036 personFolmer
  4. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye961 personDessy Suciati
  5. Pram Inaugurates Matraman Health Center, Calls for Seamless Public Service

    access_time05-06-2026 remove_red_eye792 personDessy Suciati