You don't have javascript enabled. Good luck with that.
Pencarian
Minimalisir Genangan, Pemkot Jakut Keruk Kali Petukangan Sepanjang 1.600 Meter
.
photo TP Moan Simanjuntak - Beritajakarta.id

Kali Petukangan Dredged Along 1.6 Kilometers

North Jakarta Water Resource Sub-dept. dredged Kali Petukangan in Pegangsaan Dua Urban Village, Kelapa Gading. Two unit of excavators were deployed to speed up dredging.

Mud was really dense. When raining, water can overflow easily and flooded residents

"Mud was really dense. When raining, water can overflow easily and flooded residents," said Herning Wahyuningsih, North Jakarta Water Resource Sub-dept. head, Thursday (1/19).

According to Herning, dredging process is planned along 1.6 kilometers. This will add three meters depth to Kali Petukangan which have 13 meters wide.

Petukangan Channel Normalization is Still Reviewed

"Through this effort, it can load more water in rainy season. So, we can anticipate flood at RW 09 area of Pegangsaan Dua urban district and RW 016, 09, 10, and 07 area of Kelapa Gading Timur," he closed.

Linked News
Popular News indeks
  1. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye306 personDessy Suciati
  2. Pramono Ensures KJP will Continue to Be Distributed

    access_time26-06-2025 remove_red_eye304 personDessy Suciati
  3. Governor Pramono: Jakarta E-Prix 2025 in Ancol is Amazing!

    access_time21-06-2025 remove_red_eye269 personDessy Suciati
  4. Here are Parking Spaces around Lapangan Banteng for Jakarta's Anniversary

    access_time21-06-2025 remove_red_eye265 personAldi Geri Lumban Tobing
  5. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye242 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik