You don't have javascript enabled. Good luck with that.
Pencarian
Minimalisir Genangan, Pemkot Jakut Keruk Kali Petukangan Sepanjang 1.600 Meter

Kali Petukangan Dredged Along 1.6 Kilometers

North Jakarta Water Resource Sub-dept. dredged Kali Petukangan in Pegangsaan Dua Urban Village, Kelapa Gading. Two unit of excavators were deployed to speed up dredging.

Mud was really dense. When raining, water can overflow easily and flooded residents

"Mud was really dense. When raining, water can overflow easily and flooded residents," said Herning Wahyuningsih, North Jakarta Water Resource Sub-dept. head, Thursday (1/19).

According to Herning, dredging process is planned along 1.6 kilometers. This will add three meters depth to Kali Petukangan which have 13 meters wide.

Petukangan Channel Normalization is Still Reviewed

"Through this effort, it can load more water in rainy season. So, we can anticipate flood at RW 09 area of Pegangsaan Dua urban district and RW 016, 09, 10, and 07 area of Kelapa Gading Timur," he closed.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye746 personBudhi Firmansyah Surapati
  2. BPBD Prepares 403 Evacuation Sites to Mitigate Floods in Jakarta

    access_time08-11-2026 remove_red_eye507 personBudhi Firmansyah Surapati
  3. Pramono Launches JEKATE Running 2026, Promotes Healthy Living

    access_time08-11-2026 remove_red_eye497 personDessy Suciati
  4. BI and Jakarta Government Deepen Investment, Creative Economy Collaboration

    access_time09-11-2026 remove_red_eye476 personAldi Geri Lumban Tobing
  5. Tourism and Creative Economy Boost Jakarta's Economic Growth

    access_time08-11-2026 remove_red_eye460 personDessy Suciati