You don't have javascript enabled. Good luck with that.
Pencarian
Minimalisir Genangan, Pemkot Jakut Keruk Kali Petukangan Sepanjang 1.600 Meter

Kali Petukangan Dredged Along 1.6 Kilometers

North Jakarta Water Resource Sub-dept. dredged Kali Petukangan in Pegangsaan Dua Urban Village, Kelapa Gading. Two unit of excavators were deployed to speed up dredging.

Mud was really dense. When raining, water can overflow easily and flooded residents

"Mud was really dense. When raining, water can overflow easily and flooded residents," said Herning Wahyuningsih, North Jakarta Water Resource Sub-dept. head, Thursday (1/19).

According to Herning, dredging process is planned along 1.6 kilometers. This will add three meters depth to Kali Petukangan which have 13 meters wide.

Petukangan Channel Normalization is Still Reviewed

"Through this effort, it can load more water in rainy season. So, we can anticipate flood at RW 09 area of Pegangsaan Dua urban district and RW 016, 09, 10, and 07 area of Kelapa Gading Timur," he closed.

Linked News
Popular News indeks
  1. 21 Parking Spots to Make Your Jakarta 499th Anniversary Experience Seamless

    access_time26-06-2026 remove_red_eye865 personAldi Geri Lumban Tobing
  2. Over 11 Kilometers of Overhead Utility Cables Removed in West Jakarta

    access_time26-06-2026 remove_red_eye726 personBudhi Firmansyah Surapati
  3. Celebrating Jakarta`s 499th Anniversary at HI, Please Use Public Transportation

    access_time26-06-2026 remove_red_eye704 personAldi Geri Lumban Tobing
  4. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye646 personDessy Suciati
  5. Jakarta Steps Up to the Plate as PON 2028’s Support System

    access_time24-06-2026 remove_red_eye586 personFakhrizal Fakhri