You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Rawa Kerbau Dinormalisasi

Rawa Kerbau Connecting Channel Dredged

The ranks of Central Jakarta Water Resources Sub-dept. are dredging garbage and mud in the Rawa Kerbau connecting channel on Jalan Cempaka Putih Timur, Cempaka Putih Sub-district. 

It will take about two months. It is done to maximize the function of the channel

Section Head of Maintenance for Central Jakarta Water Resources Sub-dept., Boris Karlop Lumbangaol said dredging is carried out up to two kilometers. And mud is dredged from 50-100 centimeters.

"It will take about two months. It is done to maximize the function of the channel," he expressed, Monday (4/17).

Around 100 Tons of Trash Transported from Connecting Channel

In the field, his side has sent one mini-amphibious excavator and one long-arm excavator, as well as five dump trucks to the location.

"We do this at noon which aims not to disturb the people activities around the channel," he closed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye975 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye873 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye712 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye609 personAnita Karyati