You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Saluran PHB Tegal Amba Ditargetkan Selesai Juni
.
photo Nurito - Beritajakarta.id

Tegal Amba Connecting Channel Dredged

The channel is normalized up to 790 meters length with one meter depth. It's targeted will be done in June

East Jakarta Water Resources Sub-dept. is normalizing the Tegal Amba connecting channel, Duren Sawit. It is to anticipate inundation in Klender, Duren Sawit, Pondok Bambu and its surrounding areas.

Today, Tuesday (4/18), four heavy equipments type mini amphibious and long-arm excavators are sent to those areas. Normalization will be carried out gradually from Jalan Zaenal Abidin until Jalan Tegal Amba, as long as 790 meters. 

Channel on Jalan Kebantenan III Dredged

East Jakarta Water Resources Sub-dept. Maintenance Section Head, Yoserizal said normalization is targeted to be completed in the forthcoming June.

"The channel is normalized up to 790 meters length with one meter depth. It's targeted will be done in June," he stated.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik