You don't have javascript enabled. Good luck with that.
Pencarian
Dua Ekskavator Keruk PHB Taman Alfa
.
photo Wuri Setyaningsih - Beritajakarta.id

Two Excavators Dredged Taman Alfa Channel

Two excavators deployed by South Jakarta Water Resources Sub-dept. to dredge Taman Alfa connecting (PHB) channel, Petukangan Utara Urban Village, Pesanggrahan, Friday (3/17).

It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide

Pesanggrahan Sub-district Head, Agus Irwanto said this is one of the ways to minimize flood due to overflowed PHB water.

"It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide," he said.

Residents Request to Normalize Taruna PHB Channel

He added the dredged mud from PHB channel was transported to Rawa Minyak, Pasar Minggu by using Water Resources Sub-dept. truck.

"I wish with this dredging, Petukangan area that prone to flood can be resolved. At least water level could decrease," he closed.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye557 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye451 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti