You don't have javascript enabled. Good luck with that.
Pencarian
Dua Ekskavator Keruk PHB Taman Alfa
.
photo Wuri Setyaningsih - Beritajakarta.id

Two Excavators Dredged Taman Alfa Channel

Two excavators deployed by South Jakarta Water Resources Sub-dept. to dredge Taman Alfa connecting (PHB) channel, Petukangan Utara Urban Village, Pesanggrahan, Friday (3/17).

It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide

Pesanggrahan Sub-district Head, Agus Irwanto said this is one of the ways to minimize flood due to overflowed PHB water.

"It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide," he said.

Residents Request to Normalize Taruna PHB Channel

He added the dredged mud from PHB channel was transported to Rawa Minyak, Pasar Minggu by using Water Resources Sub-dept. truck.

"I wish with this dredging, Petukangan area that prone to flood can be resolved. At least water level could decrease," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye939 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye928 personFolmer
  4. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye768 personAldi Geri Lumban Tobing
  5. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye593 personBudhi Firmansyah Surapati