You don't have javascript enabled. Good luck with that.
Pencarian
Dua Ekskavator Keruk PHB Taman Alfa
.
photo Wuri Setyaningsih - Beritajakarta.id

Two Excavators Dredged Taman Alfa Channel

Two excavators deployed by South Jakarta Water Resources Sub-dept. to dredge Taman Alfa connecting (PHB) channel, Petukangan Utara Urban Village, Pesanggrahan, Friday (3/17).

It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide

Pesanggrahan Sub-district Head, Agus Irwanto said this is one of the ways to minimize flood due to overflowed PHB water.

"It is dredged to 1.5 meters depth, 800 meters long, and 6 meters wide," he said.

Residents Request to Normalize Taruna PHB Channel

He added the dredged mud from PHB channel was transported to Rawa Minyak, Pasar Minggu by using Water Resources Sub-dept. truck.

"I wish with this dredging, Petukangan area that prone to flood can be resolved. At least water level could decrease," he closed.

Linked News
Popular News indeks
  1. Pramono Prioritizes Construction of Cakung Regional Hospital

    access_time18-04-2025 remove_red_eye471 personFakhrizal Fakhri
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye412 personBudhi Firmansyah Surapati
  3. Jakarta to Make Public Transportation Free on April 24, 2025

    access_time18-04-2025 remove_red_eye323 personAldi Geri Lumban Tobing
  4. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye285 personFakhrizal Fakhri
  5. Transjakarta Applies Special Fares for Female Customers

    access_time20-04-2025 remove_red_eye269 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik