You don't have javascript enabled. Good luck with that.
Pencarian
Pengerukan Saluran PHB Tegal Amba Ditargetkan Selesai Juni

Tegal Amba Connecting Channel Dredged

The channel is normalized up to 790 meters length with one meter depth. It's targeted will be done in June

East Jakarta Water Resources Sub-dept. is normalizing the Tegal Amba connecting channel, Duren Sawit. It is to anticipate inundation in Klender, Duren Sawit, Pondok Bambu and its surrounding areas.

Today, Tuesday (4/18), four heavy equipments type mini amphibious and long-arm excavators are sent to those areas. Normalization will be carried out gradually from Jalan Zaenal Abidin until Jalan Tegal Amba, as long as 790 meters. 

Channel on Jalan Kebantenan III Dredged

East Jakarta Water Resources Sub-dept. Maintenance Section Head, Yoserizal said normalization is targeted to be completed in the forthcoming June.

"The channel is normalized up to 790 meters length with one meter depth. It's targeted will be done in June," he stated.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye977 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye923 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye713 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye609 personAnita Karyati