You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Tanggul di Pulau Untung Jawa Sudah 42 Persen

Dike Repair in Untung Jawa Island Reaches 42 Percent

Dike repair in east side of Untung Jawa Island, Seribu Islands, reaches 42 percent. Currently, along 126 meters has been repaired from total 300 meters to be repaired.

This dike will be connected to Sakura Beach

Seribu Islands Water Resources Sub-dept. Head, Mustajab said, dike repair is using cube-shape old material which is re-arranged and cemented thus can be stronger.

"This dike will be connected to Sakura Beach," he said, Tuesday (5/9).

Type A Sea Dike Able to Minimize Flood, Basuki Says

He explained more than 3,000 old cubes were collected since January. It has been collected from the seashore, middle of the sea, or around the damaged breakwater.

"This dike is not only functioned as abrasion holder, but also could be used as ring road because it is constructed surround the island," he closed.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Routes Amid Demonstrations

    access_time28-10-2026 remove_red_eye543 personAldi Geri Lumban Tobing
  2. Central Jakarta Helps 879 Residents Retrieve Withheld Diplomas

    access_time30-10-2026 remove_red_eye522 personFolmer
  3. Tourism Industry Workforce Capacity Continues to Be Improved

    access_time30-10-2026 remove_red_eye518 personAldi Geri Lumban Tobing
  4. Free Health Checks and TB Screening Held at RPTRA Tamplas Bambu

    access_time30-10-2026 remove_red_eye517 personNurito
  5. Jakarta to Host World Cities Culture Summit 2027

    access_time31-10-2026 remove_red_eye509 personBudhi Firmansyah Surapati