You don't have javascript enabled. Good luck with that.
Pencarian
Dua Turap di Kali Baru Barat Diperbaiki
.
photo Wuri Setyaningsih - Beritajakarta.id

Kali Baru Barat River Retaining Wall Repair Reaches 40 Percent

South Jakarta Water Resources (SDA) Sub-dept. repairing Kali Baru Barat River retaining wall located on Jl. Baung and Jl. Gabus, Pasar Minggu. Recently, repair process reaches 40 percent.

Previously, some retaining walls were damaged due to landslide

"Previously, some retaining walls were damaged due to landslide. Repair process now reaches 40 percent," said Firmansyah, Maintenance Section Head of South Jakarta SDA Sub-dept., Thursday (6/8).

According to him, repaired retaining walls are on Jl. Baung by 20 meters long and 2 meters height. While retaining wall on Jl. Gabus is 55 meters long and 3 meters height.

Connector Channel Retaining Wall on Jl. Yos Sudarso Repaired

"Due to rapid flow, we damming the half of the river. We deployed 40 personnel to repair the retaining wall," he explained.

He hopes urban village and sub-district sides can monitor the riverbanks to prevent any illegal building. Because retaining wall will be damaged if there are many illegal building on the riverbank," he closed.

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1150 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye847 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye780 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye759 personAldi Geri Lumban Tobing