You don't have javascript enabled. Good luck with that.
Pencarian
Dua Turap di Kali Baru Barat Diperbaiki
.
photo Wuri Setyaningsih - Beritajakarta.id

Kali Baru Barat River Retaining Wall Repair Reaches 40 Percent

South Jakarta Water Resources (SDA) Sub-dept. repairing Kali Baru Barat River retaining wall located on Jl. Baung and Jl. Gabus, Pasar Minggu. Recently, repair process reaches 40 percent.

Previously, some retaining walls were damaged due to landslide

"Previously, some retaining walls were damaged due to landslide. Repair process now reaches 40 percent," said Firmansyah, Maintenance Section Head of South Jakarta SDA Sub-dept., Thursday (6/8).

According to him, repaired retaining walls are on Jl. Baung by 20 meters long and 2 meters height. While retaining wall on Jl. Gabus is 55 meters long and 3 meters height.

Connector Channel Retaining Wall on Jl. Yos Sudarso Repaired

"Due to rapid flow, we damming the half of the river. We deployed 40 personnel to repair the retaining wall," he explained.

He hopes urban village and sub-district sides can monitor the riverbanks to prevent any illegal building. Because retaining wall will be damaged if there are many illegal building on the riverbank," he closed.

Linked News
Popular News indeks
  1. Pramono Prioritizes Construction of Cakung Regional Hospital

    access_time18-04-2025 remove_red_eye471 personFakhrizal Fakhri
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye412 personBudhi Firmansyah Surapati
  3. Jakarta to Make Public Transportation Free on April 24, 2025

    access_time18-04-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  4. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye285 personFakhrizal Fakhri
  5. Transjakarta Applies Special Fares for Female Customers

    access_time20-04-2025 remove_red_eye271 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik