You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Cijantung Selesai Diperbaiki

Cijantung River Retaining Wall Repaired

Cijantung River retaining wall repair at Baru Urban Village, Pasar Rebo, East Jakarta has finished. It was made from river rock to make it stronger.

It is already repaired by using river rocks. Hopefully it will be not tumbled again

Baru Urban Village Head, Ali Mansyur Siregar said, the retaining wall that located at RT 08/10 was damaged by flood on last May.

"Cijantung River retaining wall condition is still natural. Thus when heavy rain or flood comes, the materials can slide easily. We hope retaining wall along Cijantung River can be plastered by concrete or river rocks thus not tumble," he said, Tuesday (7/4).

Kali Baru Barat River Retaining Wall Repair Reaches 40 Percent

Meanwhile, Pasar Rebo Sub-district Water Resources Unit Head, Puryanto said, his side repair it by using river rock to make it stronger. Retaining wall was repaired along 30 meters. Self-managed funds was used to repair it.

"It is already repaired by using river rocks. Hopefully it will be not tumbled again," he closed.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye741 personDessy Suciati
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye569 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye532 personFakhrizal Fakhri
  4. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye507 personAldi Geri Lumban Tobing
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye502 personAnita Karyati