You don't have javascript enabled. Good luck with that.
Pencarian
Perlintasan Rel Kereta Api Kebon Singkong Akhirnya Ditutup

Closure of Kebon Singkong Railway Crossing is In Trial

The closure of railway crossing in Kebon Singkong area, west side of Klender Station, East Jakarta, is in trial, Sunday (7/9).

We will evaluate it next week

This trial has been informed for a month before. 

Tomorrow, Kebon Singkong Klender Railway Crossing Closed

This railway which connects between Jl. I Gusti Ngurah Rai and Jl.Raya Bekasi is closed using railroad concrete slab. Closure information banner has been installed above it.

East Jakarta Transportation Sub-dept.'s Traffic Section Head, Andreas Eman said, since it is a double railway crossing, it is closed for road user's safety and convenience.

"This closure is in trial. We will evaluate it next week," he said, Sunday (7/9).

He added that through meeting with Ministry of Transportation last week, decision to close this railway crossing is final.

By this closure, vehicles from Jl. I Gusti Ngurah Rai must pass through Klender flyover in order to reach Jl. Raya Bekasi. While, vehicles from Jl. Raya Bekasi must turn around at Cipinang Lontar railway crossing to reach Jl. I Gusti Ngurah Rai.

Linked News
Popular News indeks
  1. Jakarta Calls on Residents to Save Energy with 60-Minute Lights-Off Action

    access_time19-09-2026 remove_red_eye423 personAldi Geri Lumban Tobing
  2. Jakarta International Stadium Sets Up Transit Schemes for The Weeknd Concert

    access_time24-09-2026 remove_red_eye395 personAldi Geri Lumban Tobing
  3. South Jakarta BPBD Distributes 44,000 Liters of Clean Water

    access_time19-09-2026 remove_red_eye359 personTiyo Surya Sakti
  4. Indonesia-Singapore Match: 80 Dishub Personnel Deployed to Manage Traffic Around GBK

    access_time25-09-2026 remove_red_eye324 personAldi Geri Lumban Tobing
  5. Jakarta Inspectorate Partners with KPK to Foster Early Anti-Corruption Culture

    access_time20-09-2026 remove_red_eye307 personFolmer