You don't have javascript enabled. Good luck with that.
Pencarian
DPRD-PT MRT Bahas Penambahan Dana Infrastruktur MRT

Council and PT. MRT Discussed About MRT Infrastructur Additional Funds

City Council held meeting with PT. Mass Rapid Transit to discuss about additional funds of MRT Phase 1 (Lebak Bulus-Bundaran HI) project infrastructure work as much as Rp 2.5 trillion.

We need to prepare it since there is Rp 2.5 trillion shortfall

City Council Vice Chairman, Mohamad Taufik said, council recommendation is needed to realize additional funds of MRT phase 1 project.

"We need to prepare it since there is Rp 2.5 trillion shortfall. MRT project will not run if we do not," he said at Council Building on 3rd floor, Wednesday (7/12).

Council Chairman will Recommend MRT Project Additional Funds

At the same place, PT. MRT Jakarta Financial Director, Tuhiyat explained, PT. MRT project needs are mount up due to structure changing that must be adjusted to the newest earthquake regulation. His side must strengthen the underground and elevated MRT construction again.

"We affirmed, it is not the design, but its construction that changed," he closed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye417 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close