You don't have javascript enabled. Good luck with that.
Pencarian
Open Traffic Simpang Susun Semangi Untuk Evaluasi Lalin
.
photo Punto Likmiardi - Beritajakarta.id

Semanggi Interchange Opens Traffic for Evaluation

Semanggi Interchange soft launching and open traffic will be done simultaneously on July 29, 2017.

Open traffic means to be used for public. Thus we will evaluate it at the same time

Jakarta Bina Marga Dept. Head, Yusmada Faizal said, open traffic is conducted to evaluate traffic flow in the area since there will be a change in road users behavior.

"Open traffic means to be used for public. Thus we will evaluate it at the same time," he said, Tuesday (7/18).

Djarot Determines Semanggi Interchange Name

According to him, his side will evaluate its lack that needs to be repaired. Thus on its inauguration day, on August 17, 2017, traffic flow around Semanggi Interchange has gone better.

"Thus, everything is ready on inauguration day," he said.

He is optimistic, open traffic can be done as schedule. Traffic lamps and signs installation are on progress. Currently, Semanggi Interchange has entered the last phase and reaches 95 percent from total work.

"Semanggi Interchange preparation, includes traffic lamps and signs, has reached 95-96 percent," he added.

He also added, park which got impact from construction is on repair progress. Several points are waiting to be repaired since it is still used for office.

"Park condition has been restored. Grass has been planted. Meanwhile, open traffic is targeted on July 29," he closed.

Linked News
Popular News indeks
  1. Waste Sorting Education Given for 500 Students of SDN 07

    access_time26-04-2024 remove_red_eye764 personAnita Karyati
  2. Mothers Attack Cheap Market in Cibubur Urban Village

    access_time02-05-2024 remove_red_eye561 personNurito
  3. 37.25 Ton of Campaign Prop Waste in West Jakarta Recycled

    access_time26-04-2024 remove_red_eye523 personTP Moan Simanjuntak
  4. LRT Phase 1B Construction Remains Positive

    access_time27-04-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. East Jakarta Sudinhub Replaces 38 Broken Convex Traffic Mirrors

    access_time26-04-2024 remove_red_eye397 personNurito