You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakut Buat Saluran di Jl Malaka III

Water Channel will Be Made on Jalan Malaka III

We do this to follow up resident's request in 2016 Musrenbang

To minimize inundation, a water channel is made on Jalan Malaka III, RT 05/10, Rorotan Urban Village, Cilincing Sub-district. 

North Jakarta Water Resources Sub-dept. Head, Yunaldi said the place does not have the water channel. Thus it is often inundated when it rains, That is why we make the channel. 

Channel Construction on Jalan Lodan Raya Re-continued

"We do this to follow up resident's request in 2016 Musrenbang. The channel will have 100 meters long and 1 meter wide," he expressed, Thursday (7/27).

He added, it has been done since two weeks ago.

"If it goes well, it can be complete in the upcoming August," he closed.

Imam (47), a resident of RT 05/10, Rorotan Urban Village expressed residents are very grateful, because it has long been residents make proposal through Musrenbang and finally can be realized this year.

"Hopefully we could be free from inundation," he hoped.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1713 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1483 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1336 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1121 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye816 personDessy Suciati