You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan LRT di Rasuna Said, Dishub Siapkan Pengaturan Lalin
.
photo istimewa - Beritajakarta.id

Traffic Engineering Prepared on Jalan Rasuna Said During LRT Project

The Cawang-Dukuh Atas Light Rail Transit (LRT) project will begin on Jalan HR Rasuna Said Kuningan, South Jakarta.

Herein, we just do limitation and diversion of traffic flows

During the project, the traffic engineering system will be applied at the location.

MRT and LRT Ready to Be Tested in August 2018

Jakarta Transportation Dept. Vice Head, Sigit Wijatmoko said, LRT project is located in the middle median of the road separator. Additionally, it will also use Transjakarta lane on the west and east sides along Jalan HR Rasuna Said.

He explained it would be executed gradually in order to avoid permanent closure.

"Herein, we just do limitation and diversion of traffic flows," he expressed, Wednesday (8/2).

According to him, it is divided into five zones. With details, zone 1 includes UP Kuningan-Kemenkes Building will begin on September 22, 2017-December 2018.

"Zone 1 project includes fence installation, facility relocation and continued with construction," he stated.

While zone 2, it begins from UP Kemenkes Building-MMC Hospital where it will be executed on August 12, 2017-December 2018. Then zone 3, it starts from UP MMC Hospital-in front of KPK Building on July 14, 2017-December 2018.

"This location is the starting point of project," he told.

Further, there is also zone 4, starting from in front of KPK Building-Landmark on September 13, 2017-December 2018, and the last is zone 5, starting from Landmark-Shangrila Hotel on November 8, 2017-December 2018.

He furthered, traffic engineering is taken, as there is reduction in road width or number of lanes. Initially there were two fast lanes, two slow lanes and one Transjakarta lane. By this project, there will be made four lanes of mix traffic.

"Road median that separates slow and fast lanes will be torn down on both sides of Jalan HR Rasuna Said," he explained.

His side also has prepared alternative lanes to parse traffic jam in the field. The road user from north heading to south and vice versa can pass on Jalan MH Thamrin and Jalan Sudirman, or Jalan Supomo-Jalan Saharjo-Kasablanka and vice versa.

"After the project is done, traffic will back to normal. We urge people to adapt the condition," he closed.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1526 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye945 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye478 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye435 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye414 personFolmer