You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Rajawali Selatan 1 Dinormalisasi
.
photo Wuri Setyaningsih - Beritajakarta.id

Rajawali Selatan 1 Connecting Channel Normalized

The connecting channel of Jalan Rajawali 1, Sawah Besar, Central Jakarta is normalized. It is carried out to restore the function of the channel, following building demolishment a while ago.

Besides that, we also repair the channel's sheet pile wall

Boris Karlop Lumbangaol, Section Head of Channel Maintenance and Treatment for Central Jakarta Water Resources Sub-dept. disclosed the channel has 1 meter width and 1.5 meters depth.

Connecting Channel at Jalan Gembira Cleaned

"The channel is malfunctioned long enough. Post-demolishment, we immediately normalize the channel," he expressed, Friday (8/24).

Normalization that has been ongoing since July 21, will normalize the channel as long as 335 meters. It is targeted to be done in the upcoming October. 

"Besides that, we also repair the channel's sheet pile wall," he stated.

To conduct it, we have sent 1 excavator and 20 freelancers to the field. The repair itself has reached 100 meters. 

Linked News
Popular News indeks
  1. Free Additional Nutritious Food Distributed to 31 Toddlers in Kalibata

    access_time13-09-2024 remove_red_eye1150 personTiyo Surya Sakti
  2. Jakarta Women's Football Team Ready to Face West Java at PON XXI Final

    access_time13-09-2024 remove_red_eye847 personFolmer
  3. Water Channel Dredging on Bendungan Melayu Reaches 50 Percent

    access_time18-09-2024 remove_red_eye828 personAnita Karyati
  4. Jakarta Leads Medal Standing at PON XXI

    access_time17-09-2024 remove_red_eye780 personFolmer
  5. PON XXI Temporary Standings: Jakarta Continues to Shadow East Java

    access_time13-09-2024 remove_red_eye757 personAldi Geri Lumban Tobing