You don't have javascript enabled. Good luck with that.
Pencarian
Saluran di Jl Cempaka Putih Timur XII Dinormalisasi

Channel on Jalan Cempaka Putih Timur XII Dredged

The ranks of Central Jakarta Water Resources Sub-dept. are cleaning a water channel alongside Jalan Cempata Putih Timir XII. They are also repairing the sheet pile in the location.

The mud is dense, so we do cleaning and dredging in the channel

Cempaka Putih Water Resources Executing Unit Head, Subandi said, the channel has 91 meters length with 60x100 centimeters width. In the channel, mud is reaching 40 centimeters height.

Channel on Jalan Mengkudu Dredged From Mud

"The mud is dense, so we do cleaning and dredging in the channel," he expressed, Saturday (9/9).

He added it is done to increase channel capacity during rainy season. It is because the water often overflows and inundates the road when it rains.

"Here, we also repair the sheet pile. Before that, we will do data collection first," he finished.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1708 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1481 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1335 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1119 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye815 personDessy Suciati