You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Kalibaru Masuki Tahap Finishing
.
photo Wuri Setyaningsih - Beritajakarta.id

Normalization on Kalibaru PHB Channel has Entered Final Phase

Normalization on Kalibaru connecting (PHB) channel, Kemayoran, Central Jakarta has entered final phase. Channel which located between Utan Panjang Urban Village and Kebun Kosong Urban Village is fully normalized as long as 700 meters.

PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others

Central Jakarta Water Resources Sub-dept. Head, Dicky Suherlan informed, Kalibaru PHB channel that has 700 meters long will be repaired by full normalization.

"PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others," he said after summit meeting (rapim), Tuesday (10/3).

Normalization on Jl. I Gusti Ngurah Rai PHB Channel Accelerated

He hopes Kalibaru PHB channel could be functioned well after normalization. Thus there will be no inundation along the channel.

"We also normalize water channels in settlement along Jl. Kalibaru Barat," he closed.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye319 personAldi Geri Lumban Tobing
  4. Smoke-Free Neighborhoods Could Be a Pilot Project for the KTR Regional Regulation Implementation

    access_time18-07-2025 remove_red_eye251 personFakhrizal Fakhri
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye250 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik