You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Kalibaru Masuki Tahap Finishing
.
photo Wuri Setyaningsih - Beritajakarta.id

Normalization on Kalibaru PHB Channel has Entered Final Phase

Normalization on Kalibaru connecting (PHB) channel, Kemayoran, Central Jakarta has entered final phase. Channel which located between Utan Panjang Urban Village and Kebun Kosong Urban Village is fully normalized as long as 700 meters.

PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others

Central Jakarta Water Resources Sub-dept. Head, Dicky Suherlan informed, Kalibaru PHB channel that has 700 meters long will be repaired by full normalization.

"PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others," he said after summit meeting (rapim), Tuesday (10/3).

Normalization on Jl. I Gusti Ngurah Rai PHB Channel Accelerated

He hopes Kalibaru PHB channel could be functioned well after normalization. Thus there will be no inundation along the channel.

"We also normalize water channels in settlement along Jl. Kalibaru Barat," he closed.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye526 personBudhi Firmansyah Surapati
  2. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye430 personAldi Geri Lumban Tobing
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye407 personDessy Suciati
  4. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye292 personTiyo Surya Sakti
  5. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye276 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik