You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Kalibaru Masuki Tahap Finishing
.
photo Wuri Setyaningsih - Beritajakarta.id

Normalization on Kalibaru PHB Channel has Entered Final Phase

Normalization on Kalibaru connecting (PHB) channel, Kemayoran, Central Jakarta has entered final phase. Channel which located between Utan Panjang Urban Village and Kebun Kosong Urban Village is fully normalized as long as 700 meters.

PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others

Central Jakarta Water Resources Sub-dept. Head, Dicky Suherlan informed, Kalibaru PHB channel that has 700 meters long will be repaired by full normalization.

"PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others," he said after summit meeting (rapim), Tuesday (10/3).

Normalization on Jl. I Gusti Ngurah Rai PHB Channel Accelerated

He hopes Kalibaru PHB channel could be functioned well after normalization. Thus there will be no inundation along the channel.

"We also normalize water channels in settlement along Jl. Kalibaru Barat," he closed.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye524 personBudhi Firmansyah Surapati
  2. Rano Requests PBSI to Hold Governor's Cup Championship

    access_time31-05-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  3. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye390 personDessy Suciati
  4. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye381 personAldi Geri Lumban Tobing
  5. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye271 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik