You don't have javascript enabled. Good luck with that.
Pencarian
 Saluran PHB Kalibaru Masuki Tahap Finishing

Normalization on Kalibaru PHB Channel has Entered Final Phase

Normalization on Kalibaru connecting (PHB) channel, Kemayoran, Central Jakarta has entered final phase. Channel which located between Utan Panjang Urban Village and Kebun Kosong Urban Village is fully normalized as long as 700 meters.

PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others

Central Jakarta Water Resources Sub-dept. Head, Dicky Suherlan informed, Kalibaru PHB channel that has 700 meters long will be repaired by full normalization.

"PHB channel normalization consists of mud dredging, river stone installation, retaining wall repair, and others," he said after summit meeting (rapim), Tuesday (10/3).

Normalization on Jl. I Gusti Ngurah Rai PHB Channel Accelerated

He hopes Kalibaru PHB channel could be functioned well after normalization. Thus there will be no inundation along the channel.

"We also normalize water channels in settlement along Jl. Kalibaru Barat," he closed.

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye624 personDessy Suciati
  2. MRT Jakarta Integrates Ticket Payments with JakLingko from October 12

    access_time10-10-2026 remove_red_eye580 personAldi Geri Lumban Tobing
  3. New Kelapa Gading-Pulogadung Road to Ease Traffic and Improve Access

    access_time10-10-2026 remove_red_eye547 personAldi Geri Lumban Tobing
  4. Kramat Pulo Fire Survivors Get Help Replacing School Documents

    access_time09-10-2026 remove_red_eye527 personFolmer
  5. Basic Supplies Distributed to Pinang Ranti Fire Survivors

    access_time09-10-2026 remove_red_eye516 personNurito