You don't have javascript enabled. Good luck with that.
Pencarian
Saluran RW 01 Kelurahan Gedong Dinormalisasi
.
photo Suparni - Beritajakarta.id

Connecting Channel of SDN 12 Gedong Normalized

East Jakarta Water Resources Sub-dept. is normalizing the connecting channel around SDN 12 Gedong, RT 07/01, Gedong, Pasar Rebo.

This channel will be widened up to 1.5 meters with 1.4 meters high and 115 meters long

"This channel will be widened up to 1.5 meters with 1.4 meters high and 115 meters long," expressed Puryanto, Taskforce Head of Pasar Rebo Sub-district for East Jakarta Water Resources Sub-dept., Monday (11/6).

Five Connecting Channels in East Jakarta Dredged

According to him, the school area is the estuary of the channel in the area of RW 01. But now, it is only about one meter and cannot accommodate water optimally.

"It's targeted to be done this month and hoped able to minimize inundation," he hoped.

Linked News
Popular News indeks
  1. Jakarta-France Strengthen Cooperation in Various Sectors

    access_time11-04-2025 remove_red_eye413 personDessy Suciati
  2. 24-Hour Park Activation, City Government Finalizes the Plan

    access_time06-04-2025 remove_red_eye300 personBudhi Firmansyah Surapati
  3. Pramono - Rano Prays for Gontor Students to Succeed in Pursuing Knowledge

    access_time08-04-2025 remove_red_eye299 personDessy Suciati
  4. 17,000 Local Tourists Flock to Ragunan Zoo Today

    access_time07-04-2025 remove_red_eye278 personTiyo Surya Sakti
  5. Returning Flow at Kampung Rambutan Bus Terminal Conducive

    access_time07-04-2025 remove_red_eye272 personNurito

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik