You don't have javascript enabled. Good luck with that.
Pencarian
Saluran RW 01 Kelurahan Gedong Dinormalisasi

Connecting Channel of SDN 12 Gedong Normalized

East Jakarta Water Resources Sub-dept. is normalizing the connecting channel around SDN 12 Gedong, RT 07/01, Gedong, Pasar Rebo.

This channel will be widened up to 1.5 meters with 1.4 meters high and 115 meters long

"This channel will be widened up to 1.5 meters with 1.4 meters high and 115 meters long," expressed Puryanto, Taskforce Head of Pasar Rebo Sub-district for East Jakarta Water Resources Sub-dept., Monday (11/6).

Five Connecting Channels in East Jakarta Dredged

According to him, the school area is the estuary of the channel in the area of RW 01. But now, it is only about one meter and cannot accommodate water optimally.

"It's targeted to be done this month and hoped able to minimize inundation," he hoped.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye750 personDessy Suciati
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye576 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye541 personFakhrizal Fakhri
  4. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye527 personDessy Suciati
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye514 personAldi Geri Lumban Tobing