You don't have javascript enabled. Good luck with that.
Pencarian
 Jalan Inspeksi KBB Dipasangi 56 PJU
.
photo Wuri Setyaningsih - Beritajakarta.id

56 PJU Lamps Installed on KBB Inspection Road

Central Jakarta Industry and Energy Sub-dept. installs PJU lamps along West Flood Canal Inspection Road, Tanah Abang. 56 LED Smart System lamps are installed to light up the area.

There are 56 LED Smart System lamps installed

"There are 56 LED Smart System lamps installed. It has nine meters tall with 90 watts. Those are installed with 30 meters distance between lamps," said Iswandi, Head Central Jakarta Industry and Energy Sub-dept., Tuesday (11/14).

According to him, all components of PJU could be monitored online by smart system. Thus any damaged or missing parts can be detected.

KBB Arrangement Socialization Phase Has Been Done

"Through the system, we can immediately detect any damaged or missing lamps. Thus our personnel can handle the problem fast," he added.

PJU lamp installation has been done since Monday (11/13) after illegal building control. "Our personnel are still installing it and will be finished today to lighten up the inspection road," he closed.

Linked News
Popular News indeks
  1. Earth Day in Jakarta Reduces 297 Tons of Carbon Emissions

    access_time27-04-2025 remove_red_eye385 personBudhi Firmansyah Surapati
  2. Pramono Wants to Strengthen Betawi Culture

    access_time26-04-2025 remove_red_eye351 personDessy Suciati
  3. Pramono Ensures to Pursue Vehicle Tax Arrears in Jakarta

    access_time30-04-2025 remove_red_eye345 personDessy Suciati
  4. Earth Day, Pramono Encourages Citizens to Switch Off Lights Simultaneously

    access_time26-04-2025 remove_red_eye324 personDessy Suciati
  5. CCTV Installation at 100 Residential Areas to Complete Next Week

    access_time25-04-2025 remove_red_eye300 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik