You don't have javascript enabled. Good luck with that.
Pencarian
 Jalan Inspeksi KBB Dipasangi 56 PJU
.
photo Wuri Setyaningsih - Beritajakarta.id

56 PJU Lamps Installed on KBB Inspection Road

Central Jakarta Industry and Energy Sub-dept. installs PJU lamps along West Flood Canal Inspection Road, Tanah Abang. 56 LED Smart System lamps are installed to light up the area.

There are 56 LED Smart System lamps installed

"There are 56 LED Smart System lamps installed. It has nine meters tall with 90 watts. Those are installed with 30 meters distance between lamps," said Iswandi, Head Central Jakarta Industry and Energy Sub-dept., Tuesday (11/14).

According to him, all components of PJU could be monitored online by smart system. Thus any damaged or missing parts can be detected.

KBB Arrangement Socialization Phase Has Been Done

"Through the system, we can immediately detect any damaged or missing lamps. Thus our personnel can handle the problem fast," he added.

PJU lamp installation has been done since Monday (11/13) after illegal building control. "Our personnel are still installing it and will be finished today to lighten up the inspection road," he closed.

Linked News
Popular News indeks
  1. District Community Health Centers in East Jakarta Operate for 24 Hours

    access_time05-04-2025 remove_red_eye501 personNurito
  2. Backflow at Kampung Rambutan Terminal Increases as Mudik Return Flow Peaks

    access_time04-04-2025 remove_red_eye490 personNurito
  3. Kalideres Bus Terminal Adds 55 Night Transport Units

    access_time05-04-2025 remove_red_eye396 personTiyo Surya Sakti
  4. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye358 personTiyo Surya Sakti
  5. Ship Surveillance in Bokor Island Waters Intensified for Eid Holiday

    access_time03-04-2025 remove_red_eye313 personAnita Karyati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik