You don't have javascript enabled. Good luck with that.
Pencarian
 Jalan Inspeksi KBB Dipasangi 56 PJU
.
photo Wuri Setyaningsih - Beritajakarta.id

56 PJU Lamps Installed on KBB Inspection Road

Central Jakarta Industry and Energy Sub-dept. installs PJU lamps along West Flood Canal Inspection Road, Tanah Abang. 56 LED Smart System lamps are installed to light up the area.

There are 56 LED Smart System lamps installed

"There are 56 LED Smart System lamps installed. It has nine meters tall with 90 watts. Those are installed with 30 meters distance between lamps," said Iswandi, Head Central Jakarta Industry and Energy Sub-dept., Tuesday (11/14).

According to him, all components of PJU could be monitored online by smart system. Thus any damaged or missing parts can be detected.

KBB Arrangement Socialization Phase Has Been Done

"Through the system, we can immediately detect any damaged or missing lamps. Thus our personnel can handle the problem fast," he added.

PJU lamp installation has been done since Monday (11/13) after illegal building control. "Our personnel are still installing it and will be finished today to lighten up the inspection road," he closed.

Linked News
Popular News indeks
  1. Hasan Abdillah Hopes Governor-elect to Realize Jakarta a Global City

    access_time10-01-2025 remove_red_eye937 personDessy Suciati
  2. Enjoying Nutritious Food, Aqila Writes to President Prabowo

    access_time10-01-2025 remove_red_eye935 personNurito
  3. Acting Governor Teguh Inspects MBG Distribution at SMPN 61 Jakarta

    access_time06-01-2025 remove_red_eye898 personFolmer
  4. 2,987 MBG Packages Distributed in Palmerah

    access_time06-01-2025 remove_red_eye777 personFolmer
  5. Khoirudin: Healthy Water Card Helps Residents Access Clean Water

    access_time08-01-2025 remove_red_eye744 personDessy Suciati