You don't have javascript enabled. Good luck with that.
Pencarian
 Jalan Inspeksi KBB Dipasangi 56 PJU
.
photo Wuri Setyaningsih - Beritajakarta.id

56 PJU Lamps Installed on KBB Inspection Road

Central Jakarta Industry and Energy Sub-dept. installs PJU lamps along West Flood Canal Inspection Road, Tanah Abang. 56 LED Smart System lamps are installed to light up the area.

There are 56 LED Smart System lamps installed

"There are 56 LED Smart System lamps installed. It has nine meters tall with 90 watts. Those are installed with 30 meters distance between lamps," said Iswandi, Head Central Jakarta Industry and Energy Sub-dept., Tuesday (11/14).

According to him, all components of PJU could be monitored online by smart system. Thus any damaged or missing parts can be detected.

KBB Arrangement Socialization Phase Has Been Done

"Through the system, we can immediately detect any damaged or missing lamps. Thus our personnel can handle the problem fast," he added.

PJU lamp installation has been done since Monday (11/13) after illegal building control. "Our personnel are still installing it and will be finished today to lighten up the inspection road," he closed.

Linked News
Popular News indeks
  1. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye315 personDessy Suciati
  2. Pramono Ensures KJP will Continue to Be Distributed

    access_time26-06-2025 remove_red_eye312 personDessy Suciati
  3. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye298 personAldi Geri Lumban Tobing
  4. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye296 personTiyo Surya Sakti
  5. Transjakarta Wins Award for Best GCG Company

    access_time27-06-2025 remove_red_eye284 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik