You don't have javascript enabled. Good luck with that.
Pencarian
 Jalan Inspeksi KBB Dipasangi 56 PJU
.
photo Wuri Setyaningsih - Beritajakarta.id

56 PJU Lamps Installed on KBB Inspection Road

Central Jakarta Industry and Energy Sub-dept. installs PJU lamps along West Flood Canal Inspection Road, Tanah Abang. 56 LED Smart System lamps are installed to light up the area.

There are 56 LED Smart System lamps installed

"There are 56 LED Smart System lamps installed. It has nine meters tall with 90 watts. Those are installed with 30 meters distance between lamps," said Iswandi, Head Central Jakarta Industry and Energy Sub-dept., Tuesday (11/14).

According to him, all components of PJU could be monitored online by smart system. Thus any damaged or missing parts can be detected.

KBB Arrangement Socialization Phase Has Been Done

"Through the system, we can immediately detect any damaged or missing lamps. Thus our personnel can handle the problem fast," he added.

PJU lamp installation has been done since Monday (11/13) after illegal building control. "Our personnel are still installing it and will be finished today to lighten up the inspection road," he closed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. Second Pilkada 2024 Debate Theme Set, Don't Miss It

    access_time26-10-2024 remove_red_eye777 personAldi Geri Lumban Tobing
  3. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye643 personBudhi Firmansyah Surapati
  4. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  5. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye392 personTiyo Surya Sakti