You don't have javascript enabled. Good luck with that.
Pencarian
 Jalan Inspeksi KBB Dipasangi 56 PJU
.
photo Wuri Setyaningsih - Beritajakarta.id

56 PJU Lamps Installed on KBB Inspection Road

Central Jakarta Industry and Energy Sub-dept. installs PJU lamps along West Flood Canal Inspection Road, Tanah Abang. 56 LED Smart System lamps are installed to light up the area.

There are 56 LED Smart System lamps installed

"There are 56 LED Smart System lamps installed. It has nine meters tall with 90 watts. Those are installed with 30 meters distance between lamps," said Iswandi, Head Central Jakarta Industry and Energy Sub-dept., Tuesday (11/14).

According to him, all components of PJU could be monitored online by smart system. Thus any damaged or missing parts can be detected.

KBB Arrangement Socialization Phase Has Been Done

"Through the system, we can immediately detect any damaged or missing lamps. Thus our personnel can handle the problem fast," he added.

PJU lamp installation has been done since Monday (11/13) after illegal building control. "Our personnel are still installing it and will be finished today to lighten up the inspection road," he closed.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye359 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye320 personAldi Geri Lumban Tobing
  4. Council Urges Free School Programs to Prioritize Principles of Fairness and Quality

    access_time18-07-2025 remove_red_eye291 personFakhrizal Fakhri
  5. C. Jakarta TP PKK Grows 2,470 Chili and Tomato Seedlings

    access_time18-07-2025 remove_red_eye289 personFolmer

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik