You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Depo MRT Capai 92,5 Persen
.
photo Wuri Setyaningsih - Beritajakarta.id

MRT Depot Construction Reaches 92.5 Percent

PT. MRT Jakarta Director, William P. Sabandar said, Lebak Bulus Mass Rapid Transit (MRT) Depot construction is entering finishing phase. His side ensures construction of Depot that located on Jalan R.A. Kartini, South Jakarta will be completed in 2018.

Currently Lebak Bulus MRT Depot construction has reached 92.5 percent

"Currently Lebak Bulus MRT Depot construction has reached 92.5 percent. It means all equipment have been installed and now is entering finishing phase," he conveyed, Friday (4/13).

He explained, Depot that built above 10.5 hectare land is the maintenance center of MRT Jakarta trains, which is functioned as train workshop, place to wash trains, office.

MRT Construction Reaches 92.50 Percent

"This depot is also used for departure, arrival, train's exit and entrance, and rest area for MRT Jakarta," he informed.

Though trains are arrived from Japan, he continued, but the future technician team is Indonesian.

"Later on, technician team will not be from Japan, but from our side since they have been trained for this," he affirmed.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye954 personTP Moan Simanjuntak
  2. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye659 personBudhi Firmansyah Surapati
  3. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  4. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye395 personTiyo Surya Sakti
  5. Traffic Arrangement Applied on Jalan Tambak

    access_time28-10-2024 remove_red_eye370 personAldi Geri Lumban Tobing