You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan Turap di Kelapa Gading Capai 1.760 Meter

Retaining Wall of 10 PHB Channels in Kelapa Gading Repaired

Retaining wall repair towards 10 water channels in Kelapa Gading Sub-district, North Jakarta has started since January and recently its repair reaches 1,760 meters long.

Those retaining walls are damaged with different conditions

Kelapa Gading Water Resources (SDA) Unit Head, Rukmana informed, 4 of 10 water channel retaining walls that have been repaired are Gading Kirana PHB channel, Gading Batavia PHB channel, Janur Elok PHB channel, and Kelapa Puan PHB channel.

Jl. Flamboyan PHB Channel's Retaining Wall Repaired

"Those retaining walls are damaged with different conditions, such as collapsed, cracked, degradation, and prone to collapse," he conveyed, Wednesday (7/25).

Currently his side repairs PHB channel with 155 meters long on Jl. Flamboyan.

While four remaining locations such as Kelapa Cengkir PHB channel, Prihatin PHB channel, and PHB channel on the western side of Kodamar Tengah Reservoir are on survey progress. Repair on those four channels are estimated to reach 500 meters long.

"Beyond those locations, we will prioritize any channels that need immediate repair," he added.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1439 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1096 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati