You don't have javascript enabled. Good luck with that.
Pencarian
6 Ruas Jalan Tol Dilengkapi Jalur Angkutan Umum
Pembangunan enam ruas jalan tol di ibu kota akhirnya akan terealisasi. Hal itu ditandai dengan ditandatanganinya kesepakatan bersama bersama Badan Pengatur Jalan Tol (BPJT) Kementerian Pekerjaan Umum dan PT Jakarta Tollroad Development (JTD). Nantin.
photo Erna Martiyanti - Beritajakarta.id

6 Toll Roads Project will Be Equipped with Public Transport Lane

Construction of six toll roads in the capital will finally be realized. It is marked by the signing of a joint agreement with the Indonesian Toll Road Authority (BPJT) for Public Works Ministry and PT Jakarta Tollroad Development (JTD). Later on, the toll roads will be equipped with a public transport lane.

I am very grateful because there is an agreement signature over construction of six toll roads in the city

Such signing was conducted by City Secretary Saefullah, Head of BPJT Ahamd Ghani Ghazali Akman, and Director of PT JTD Frans Sunito.

Vice Jakarta Governor, Basuki 'Ahok' T Purnama disclosed that the project is a phenomenon in the toll road sector, where its investment reached Rp 42 trillion. He also felt happy because of this mega project built soon.

Become Governor, Basuki Will Focus on 6 Inner-City Toll Roads Construction

He furthered the road ratio could be added, which is reaching six percent. Ideally, it must be 12 percent. Hence, one way to realize it is by adding road segments via six toll roads construction.

"I am very grateful because there is an agreement signature over construction of six toll roads in the city," admitted Basuki who participated in the signing of an agreement with the Ministry of Public Works, Friday (7/25).

On the other hand, Public Works Minister, Djoko Kirmanto stated the investment reaches Rp 42 trillion, and all set in the concession agreement (PPJT). The high fund of the project is caused by mostly the construction is dominated by elevated road on the existing road corridor.

Another uniqueness, he furthered, is special lane for public transport thus it cannot disrupt traffic flow on the toll road. Thus, the six toll roads will be integrated with other transportation modes.

The project belongs to PT JTD is divided into four phases and is planned to complete in 2022. First phase is Semanan-Sunter corridor as long as 20.23 kilometers with a total investment of Rp 9.76 trillion, and Sunter-Pulogebang corridor as long as 9.44 kilometers worth Rp 7.37 trillion.

Second phase is Duri Pulo-Kampung Melayu corridor as long as 12.65 kilometers with total investment Rp 5.96 trillion, and Kemayoran-Kampung Melayu corridor as long as 9.60 kilometers worth Rp 6.95 trillion.

Third phase is Ulujami-Tanah Abang corridor as long as 8.70 kilometers with total investment Rp 4.25 trillion. And the last phase is Pasar Minggu-Casablanca corridor as long as 9.15 kilometers with total investment Rp 5.71 trillion.

The total length of those six inner-city toll roads is 69.77 kilometers.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1217 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1054 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye909 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye735 personFolmer
  5. TMII Prepares Stuntman Show to Music Concert

    access_time23-12-2024 remove_red_eye689 personNurito