You don't have javascript enabled. Good luck with that.
Pencarian
Proses Perbaikan Saluran Penghubung Kelapa Cengkir Capai 40 Persen

Kelapa Cengkir PHB Channel Repair Reaches 40 Percent

Repair on Kelapa Cengkir PHB channel's retaining walls in Kelapa Gading Timur Urban Village, Kelapa Gading, North Jakarta is now reached 40 percent.

Total, we repair 608 meters retaining wall.

Water Resources (SDA) Sub-dept.'s Kelapa Gading Sub-district Unit Head, Rukmana explained, retaining walls on both sides of the channel are repaired along 304 meters.

Halim Perdanakusuma Reservoir's Retaining Wall Repaired

"Total, we repair 608 meters retaining wall. Currently we have repaired 300 meters or about 40 percent," he informed, Monday (10/8).

He mentioned, previously the retaining walls were broken and tilted due to tree roots.

"Hopefully it can be finished in November," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1117 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye995 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye951 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye727 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye627 personAnita Karyati