You don't have javascript enabled. Good luck with that.
Pencarian
 JPM Tanah Abang Siap Digunakan Pada 15 Oktober 2018
.
photo Rezki Apriliya Iskandar - Beritajakarta.id

Tanah Abang Skybridge Construction to Reach 70 Percent

Tanah Abang Skybridge construction has reached 70 percent by October 11, 2018.

I am optimistic Tanah Abang Skybridge can be used by public on October 15

PD. Pembangunan Sarana Jaya President Director, Yoory C. Pinontoan said, construction includes steel frame installation which is used as a bridge buffer.

"I am optimistic Tanah Abang Skybridge can be used by public on October 15," he affirmed, Thursday (10/11).

Tanah Abang Skybridge Construction Reaches 58 Percent

He mentioned, currently his side installs skybridge's ceiling, flooring, and constructs the ramp. His side continues to optimize the construction. This construction is done by 100 workers who are divided in two shifts, 4 AM-7 PM and 7 PM-4 AM.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1223 personDessy Suciati
  2. First Jakarta Update Talks Nataru up to Water Tariff Adjustment

    access_time24-12-2024 remove_red_eye1051 personDessy Suciati
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye913 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye737 personFolmer
  5. TMII Prepares Stuntman Show to Music Concert

    access_time23-12-2024 remove_red_eye708 personNurito