You don't have javascript enabled. Good luck with that.
Pencarian
PT MRT Jakarta Lakukan System Acceptance Test

PT MRT Jakarta Conducts System Acceptance Test

PT Mass Rapid Transit (MRT) Jakarta is checking the system acceptance test (SAT) on Phase I MRT Jakarta train system that connects Lebak Bulus-HI Roundabout. It has been ongoing since August 9-end of January 2019.

This test is important to be done as part of testing and commissioning prior to the operation is carried out

"This test is important to be done as part of testing and commissioning prior to the operation is carried out," expressed William P Sabandar, President Director of MRT Jakarta, Wednesday (10/17).

He explained that it is conducted with the aim of checking the entire MRT system starting from the signaling system, electrical system, telecommunication system, track work or rail system, overhead contact system (OCS), screen door platform, and all available information systems at depots and stations.

PT MRT Jakarta Starts to Complete Disability-friendly Facilities

"It's done by static way in each system and checking dynamically or checking the system by running a train (the first train car)," he explained.

After checking the system in December, his side will also check the MRT train until mid-February 2019 or before the MRT train officially operates.

"At this stage, the second train will begin to be run to check trains until the 16th train," he said.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1295 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1126 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye289 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye285 personAldi Geri Lumban Tobing