You don't have javascript enabled. Good luck with that.
Pencarian
 Turap Kali Cabang Tengah Dibangun
.
photo Wuri Setyaningsih - Beritajakarta.id

S. Jakarta SDA Builds New Retaining Walls at Cabang Tengah River

South Jakarta Water Resources (SDA) Sub-dept. builds new retaining walls in Cabang Tengah River, Jl. Kahfi II, Jagakarsa Sub-district, South Jakarta.

New retaining wall has 266 meters long for the right side and 474.6 meters for the left side

South Jakarta SDA Sub-dept. Development Section Head, Didi Sugandhi stated, construction is done because former retaining wall is prone to landslide.

"New retaining wall has 266 meters long for the right side and 474.6 meters for the left side. Its length reaches 2-5 meters," he informed, Wednesday (11/7).

Collapsed Retaining Wall in Pejagalan will Be Repaired Soon

He explained, his side uses third party from e-catalog auction system to build the new retaining walls. This contract mentioned Rp 4,704,452,613 for its value with construction period from October 1 to December 15.

"Until now, retaining wall construction has reached 45 percent," he mentioned.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1043 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye908 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye552 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye448 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye386 personAldi Geri Lumban Tobing