You don't have javascript enabled. Good luck with that.
Pencarian
 Delapan Pompa di Kecamatan Koja Siap Antisipasi Banjir di Musim Penghujan

Eight Pumps In Koja Ready to Overcome Inundation

Eight pumps on five water pumps located on Koja Sub-district, North Jakarta are ready to be used to handle inundation during rainy season.

We check all personnel and our infrastructures. All pumps are also in ready condition

It was conveyed by North Jakarta Mayor, Syamsudin Lologau when he led flood preparation during a morning assembly in Koja Sub-district, Wednesday (11/28). There are 600 joint personnel from all regions of Koja Sub-district attended in this assembly.

City Owns Flood Monitoring Application

"We check all personnel and our infrastructures. All pumps are also in ready condition," he stated.

Those pumps in five pump houses are in good condition and ready to handle rising water volume in water channels or rivers in the peak of rainy season.

Koja Sub-district Head, Yusuf Madjid explained, there are five pump houses in his area. One pump with 500 liters per second capacity in Kresek River; three pumps with 5,000 liters per second capacity in Rawa Badak Reservoir; two pumps with 2,500 liters per second capacity in Pinang; and one pump with 500 liters per second capacity in Melayu Reservoir.    

"Koja preparation is very depended on pumps because it is located in lowlands. Currently, all pumps are in a good condition," he conveyed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1082 personFolmer
  2. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye467 personAldi Geri Lumban Tobing
  3. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye466 personBudhi Firmansyah Surapati
  4. Setu Babakan Presents Arts and Culture Extravaganza to Mark Jakarta Anniversary

    access_time20-06-2026 remove_red_eye434 personNurito
  5. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye431 personDessy Suciati