You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB di Jalan Mayjen Soetoyo Dibersihkan

Connecting Channel on Jalan Mayjen Soetoyo Dredged

A connecting channel on Jalan Mayjen Soetoyo, Cililitan Urban Village, East Jakarta was dredged from garbage and mud.

They managed to dredge the channel from 1 meter into 60 centimeters depth. While for its mud thickness reaches 40 centimeters

Kramat Jati Sub-district Water Resources Executing Unit Head, Muchlis said, to conduct dredging, around 11 officers in blue uniforms were deployed to the field.

Aside that, the channel itself has 150 meters length. 

Kebagusan Retention Basin Dredging Continued

"They managed to dredge the channel from 1 meter into 60 centimeters depth. While for its mud thickness reaches 40 centimeters," he expressed, Wednesday (1/9).

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close