You don't have javascript enabled. Good luck with that.
Pencarian
Pemkot Jaktim akan Bangun Polder di RW 07 Pekayon

East Jakarta to Build Polder at RW 07 Pekayon to Prevent Flood

Starting Monday (1/28), East Jakarta is about to build polder at RT 04/07, Pekayon, Pasar Rebo. Polder is used to handle flood which is often happened when Cipinang River overflowed.

The fastest is to start it by today thus we can check its progress on next Wednesday

"The fastest is to start it by today thus we can check its progress on next Wednesday," stated Muhammad Anwar, East Jakarta Mayor, Saturday (1/26).

Polder Becomes Part of NCICD Phase A Project

His side plans to build polder on the 8,900 square meters land owned by East Jakarta Forestry Sub-department.

Acting Pasar Rebo Head (Plt), Panangaran Ritonga conveyed, RW 07 Pekayon is prone to flood because it is a basin area and its location is crossed by the Cipinang River.

"We have prepared 2,000 square meters land to build polder," he added.

Pasar Rebo Water Resources (SDA) Unit Head, Puryanto is targeting to complete polder construction in two weeks.

"Hopefully there will be no inundation on the location after polder is built," he mentioned.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye356 personAldi Geri Lumban Tobing
close