You don't have javascript enabled. Good luck with that.
Pencarian
Pemkot Jaktim akan Bangun Polder di RW 07 Pekayon

East Jakarta to Build Polder at RW 07 Pekayon to Prevent Flood

Starting Monday (1/28), East Jakarta is about to build polder at RT 04/07, Pekayon, Pasar Rebo. Polder is used to handle flood which is often happened when Cipinang River overflowed.

The fastest is to start it by today thus we can check its progress on next Wednesday

"The fastest is to start it by today thus we can check its progress on next Wednesday," stated Muhammad Anwar, East Jakarta Mayor, Saturday (1/26).

Polder Becomes Part of NCICD Phase A Project

His side plans to build polder on the 8,900 square meters land owned by East Jakarta Forestry Sub-department.

Acting Pasar Rebo Head (Plt), Panangaran Ritonga conveyed, RW 07 Pekayon is prone to flood because it is a basin area and its location is crossed by the Cipinang River.

"We have prepared 2,000 square meters land to build polder," he added.

Pasar Rebo Water Resources (SDA) Unit Head, Puryanto is targeting to complete polder construction in two weeks.

"Hopefully there will be no inundation on the location after polder is built," he mentioned.

Linked News
Popular News indeks
  1. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2416 personTiyo Surya Sakti
  2. Telkomsel Digiland Run 2026 Parking Lot List: Check Now!

    access_time14-05-2026 remove_red_eye1135 personAldi Geri Lumban Tobing
  3. Pramono: Jakarta Remains the Capital City Until a Presidential Decree Is Issued

    access_time13-05-2026 remove_red_eye894 personDessy Suciati
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye888 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye772 personBudhi Firmansyah Surapati