You don't have javascript enabled. Good luck with that.
Pencarian
Anies Paparkan Rencana Pembangunan Moda Transportasi Terintegrasi

Integrated Transportation Modes Development Planned to Be Realized Gradually

It could take a long time to finish but it spends low cost

Jakarta governor, Anies Baswedan explains about integrated transportation modes development plan that will be realized gradually in these 10 years.

LRT Lane Construction, Palyja's Pipe on Jl. Gatot Subroto will Be Relocated

"It could take a long time to finish but it spends low cost or it could finish in short time but spends high cost," he said at City Hall, while explaining his meeting with Vice President, Jusuf Kalla, together with Finance Minister, Economy Minister, Transportation Minister, BUMN Minister, PUPR Minister, and Regional Heads of Bogor, Depok, Tangerang, and Bekasi, Monday (1/28).

He stated, Jakarta is in the process of developing its transportation modes. For information, Transjakarta lane currently reaches 1,100 kilometers in from total target 2,149 kilometers. LRT also reaches 5.8 kilometers from total target more than 130 kilometers. While MRT now reaches 16 kilometers from target 112 kilometers.

He said that his side needs to estimate the cost in advance to set target for implementing this integrated transportation system.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close