You don't have javascript enabled. Good luck with that.
Pencarian
Uji Coba MRT, Bundaran HI - Lebak Bulus Ditempuh 30 Menit

MRT Trial, HI-Lebak Bulus Only Takes 30 Minutes

PT MRT Jakarta continues to conduct an operation trial towards the Ratangga MRT train.

train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes

PT MRT Jakarta William President Director, William Sabandar stated that there have been eight trains that run simultaneously or two-way with a train distance of 10 minutes. And today, the trial is done from HI Roundabout towards Lebak Bulus.

Five MRT Stations Offer Kiosks for UMKMs

"Based on trial results, train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes," he expressed, at HI Roundabout MRT Station, Wednesday (1/30).

It is targeted that the train to be added up to 14 units with a five-minute train distance. It will be realized for commercial operation in March.

"It's assured that train will operate with ten and five minutes headways. Until now it is on the target," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1576 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1436 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1301 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1094 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye965 personDessy Suciati