You don't have javascript enabled. Good luck with that.
Pencarian
Uji Coba MRT, Bundaran HI - Lebak Bulus Ditempuh 30 Menit
.
photo istimewa - Beritajakarta.id

MRT Trial, HI-Lebak Bulus Only Takes 30 Minutes

PT MRT Jakarta continues to conduct an operation trial towards the Ratangga MRT train.

train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes

PT MRT Jakarta William President Director, William Sabandar stated that there have been eight trains that run simultaneously or two-way with a train distance of 10 minutes. And today, the trial is done from HI Roundabout towards Lebak Bulus.

Five MRT Stations Offer Kiosks for UMKMs

"Based on trial results, train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes," he expressed, at HI Roundabout MRT Station, Wednesday (1/30).

It is targeted that the train to be added up to 14 units with a five-minute train distance. It will be realized for commercial operation in March.

"It's assured that train will operate with ten and five minutes headways. Until now it is on the target," he stated.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye926 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye390 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti