You don't have javascript enabled. Good luck with that.
Pencarian
Uji Coba MRT, Bundaran HI - Lebak Bulus Ditempuh 30 Menit

MRT Trial, HI-Lebak Bulus Only Takes 30 Minutes

PT MRT Jakarta continues to conduct an operation trial towards the Ratangga MRT train.

train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes

PT MRT Jakarta William President Director, William Sabandar stated that there have been eight trains that run simultaneously or two-way with a train distance of 10 minutes. And today, the trial is done from HI Roundabout towards Lebak Bulus.

Five MRT Stations Offer Kiosks for UMKMs

"Based on trial results, train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes," he expressed, at HI Roundabout MRT Station, Wednesday (1/30).

It is targeted that the train to be added up to 14 units with a five-minute train distance. It will be realized for commercial operation in March.

"It's assured that train will operate with ten and five minutes headways. Until now it is on the target," he stated.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1410 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye849 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye650 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye599 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye470 personBudhi Firmansyah Surapati