You don't have javascript enabled. Good luck with that.
Pencarian
Uji Coba MRT, Bundaran HI - Lebak Bulus Ditempuh 30 Menit

MRT Trial, HI-Lebak Bulus Only Takes 30 Minutes

PT MRT Jakarta continues to conduct an operation trial towards the Ratangga MRT train.

train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes

PT MRT Jakarta William President Director, William Sabandar stated that there have been eight trains that run simultaneously or two-way with a train distance of 10 minutes. And today, the trial is done from HI Roundabout towards Lebak Bulus.

Five MRT Stations Offer Kiosks for UMKMs

"Based on trial results, train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes," he expressed, at HI Roundabout MRT Station, Wednesday (1/30).

It is targeted that the train to be added up to 14 units with a five-minute train distance. It will be realized for commercial operation in March.

"It's assured that train will operate with ten and five minutes headways. Until now it is on the target," he stated.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2630 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2324 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye972 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye834 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye733 personBudhi Firmansyah Surapati