You don't have javascript enabled. Good luck with that.
Pencarian
Uji Coba MRT, Bundaran HI - Lebak Bulus Ditempuh 30 Menit
.
photo istimewa - Beritajakarta.id

MRT Trial, HI-Lebak Bulus Only Takes 30 Minutes

PT MRT Jakarta continues to conduct an operation trial towards the Ratangga MRT train.

train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes

PT MRT Jakarta William President Director, William Sabandar stated that there have been eight trains that run simultaneously or two-way with a train distance of 10 minutes. And today, the trial is done from HI Roundabout towards Lebak Bulus.

Five MRT Stations Offer Kiosks for UMKMs

"Based on trial results, train arrival from HI Roundabout station towards Lebak Bulus reaches around 30 minutes," he expressed, at HI Roundabout MRT Station, Wednesday (1/30).

It is targeted that the train to be added up to 14 units with a five-minute train distance. It will be realized for commercial operation in March.

"It's assured that train will operate with ten and five minutes headways. Until now it is on the target," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1037 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye903 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing