You don't have javascript enabled. Good luck with that.
Pencarian
Dishub Berlakukan Rekayasa Lalin di Simpang Kuningan Besok

Traffic Engineering to Be Applied at Kuningan Junction

Traffic engineering to be applied at Kuningan junction in order to smoothen erection box girder installation work for Cawang-Dukuh LRT on February 2 - August 9, 2019.

This work takes 10 days

"This work takes 10 days," expressed Jakarta Transportation Department Acting Head, Sigit Widjatmoko, Thursday (1/31).

It will be applied in two sections, as follow;

PT MRT to Modify TB Simatupang Crossing Bridge

1. Shoring P206 demolishment work on the west side of the underpass on February 2-6 at around 11 PM-4 AM

- Vehicle coming from Mampang (south side) - Menteng (north side) which passes through the underpass is diverted out of the middle ramp through Kuningan junction - Jalan HR Rasuna Said on the west side (beside the underpass) - Menteng, etc

2. Iron installation and casting work on the east side of Jalan HR Rasuana Said

- Vehicle on the slow lane from Menteng towards Mampang, Pancoran and Semanggi, will be rerouted in front of Tempo building through Jalan Patra Terusan - Jalan Gatot Subroto - U-turn before Pancoran junction - Kuningan junction (straight towards Semanggi, turn left to Mampang/Tegal Parang). 

Widjatmoko continued that vehicle can also use Jalan HR Rasuna Said - underpass - Mampang - exit the middle ramp - turn left to Pancoran or U-turn at Mampang Tendean Junction - turn left to Semanggi, etc

"I hope every motorist can obey the traffic rules and the field officer's direction," he hoped. 

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye959 personAldi Geri Lumban Tobing
  2. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye644 personAldi Geri Lumban Tobing
  3. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye612 personDessy Suciati
  4. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye608 personAldi Geri Lumban Tobing
  5. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye607 personDessy Suciati