You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Depo Sampah Waduk Cincin Masuki Tahap Perencanaan
.
photo istimewa - Beritajakarta.id

Waste Depot Construction in Cincin Reservoir Has Entered Planning Stage

The eco-friendly waste depot construction in Cincin Reservoir area, Papanggo Urban Village, Tanjung Priok, North Jakarta has entered planning consultation stage.

Right now it has entered planning consultation stage prior to auction process

North Jakarta Environment Sub-agency Head, Slamet Riyadi added that it would be built on a 1,600-square-meter width land by spending Rp 3 billion.

Koja Eco-Friendly Waste Depot Operated

"Right now it has entered planning consultation stage prior to auction process. Hopefully it can be realized by the end of this year," he expressed, Wednesday (2/27).

According to eco-friendly concept, the depot will be completed with various facilities such as, installation of wastewater treatment plant (IPAL), processing of waste organic, inorganic and composter.

"Its concept is 3 R (reuse, reduce, and recycle). So later not all waste is disposed to Bantar Gebang, as sorting has been done," he stated.

Linked News
Popular News indeks
  1. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye357 personTiyo Surya Sakti
  2. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye329 personAldi Geri Lumban Tobing
  3. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye319 personAldi Geri Lumban Tobing
  4. Smoke-Free Neighborhoods Could Be a Pilot Project for the KTR Regional Regulation Implementation

    access_time18-07-2025 remove_red_eye263 personFakhrizal Fakhri
  5. Council Encourages the Increase of RPTRAs for Child Growth and Development

    access_time18-07-2025 remove_red_eye260 personFakhrizal Fakhri

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik