You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Depo Sampah Waduk Cincin Masuki Tahap Perencanaan

Waste Depot Construction in Cincin Reservoir Has Entered Planning Stage

The eco-friendly waste depot construction in Cincin Reservoir area, Papanggo Urban Village, Tanjung Priok, North Jakarta has entered planning consultation stage.

Right now it has entered planning consultation stage prior to auction process

North Jakarta Environment Sub-agency Head, Slamet Riyadi added that it would be built on a 1,600-square-meter width land by spending Rp 3 billion.

Koja Eco-Friendly Waste Depot Operated

"Right now it has entered planning consultation stage prior to auction process. Hopefully it can be realized by the end of this year," he expressed, Wednesday (2/27).

According to eco-friendly concept, the depot will be completed with various facilities such as, installation of wastewater treatment plant (IPAL), processing of waste organic, inorganic and composter.

"Its concept is 3 R (reuse, reduce, and recycle). So later not all waste is disposed to Bantar Gebang, as sorting has been done," he stated.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye975 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye845 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye712 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye609 personAnita Karyati