You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Depo Sampah Waduk Cincin Masuki Tahap Perencanaan

Waste Depot Construction in Cincin Reservoir Has Entered Planning Stage

The eco-friendly waste depot construction in Cincin Reservoir area, Papanggo Urban Village, Tanjung Priok, North Jakarta has entered planning consultation stage.

Right now it has entered planning consultation stage prior to auction process

North Jakarta Environment Sub-agency Head, Slamet Riyadi added that it would be built on a 1,600-square-meter width land by spending Rp 3 billion.

Koja Eco-Friendly Waste Depot Operated

"Right now it has entered planning consultation stage prior to auction process. Hopefully it can be realized by the end of this year," he expressed, Wednesday (2/27).

According to eco-friendly concept, the depot will be completed with various facilities such as, installation of wastewater treatment plant (IPAL), processing of waste organic, inorganic and composter.

"Its concept is 3 R (reuse, reduce, and recycle). So later not all waste is disposed to Bantar Gebang, as sorting has been done," he stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close