You don't have javascript enabled. Good luck with that.
Pencarian
Depo Sampah Ramah Lingkungan di Koja Resmi Dioperasikan

Koja Eco-Friendly Waste Depot Operated

Eco-friendly waste depot on Jalan Inspeksi Kali Sunter, RW 09, Rawa Badak Utara, Koja, North Jakarta which is built using PT. Pertamina's Corporate Social Responsibility (CSR) fund is officially operated today.

Waste collecting time will be scheduled from afternoon to night

Koja Sub-district Head, Yusuf Madjid mentioned, this depot can accommodate waste from 903 RTs in six urban villages of Koja Sub-district before it is transported to Bantargebang. Waste collection in each RT/RWs will be scheduled to prevent it from pilling up.

30 Cubic Meters of Waste Transported From Pari Island

"Waste collecting time will be scheduled from afternoon to night. Then we will transport it to Bantargebang around night to morning," he said at the location, Friday (12/14).

He mentioned that waste collection schedule had been socialized to residents even before waste depot construction is completed.

"Former depot land is now used as parking lot. The new depot has been handed over by Pertamina. We will operate it this afternoon," he added.

On the same location, PT. Pertamina Jakarta Fuel Terminal Operational Head, Budi Prasojo explained, around 17x15 meters of total 510 square meters land is made into permanent eco-friendly waste depot.

"We also provide sewage treatment pipes thus it will not cause unpleasant smell. Hopefully it can be useful for the residents," he conveyed.

Linked News
Popular News indeks
  1. Temporary Crosswalk to Be Built at Tendean Pedestrian Bridge Site

    access_time18-07-2026 remove_red_eye1573 personFakhrizal Fakhri
  2. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1158 personDessy Suciati
  3. Gas Stove Leak Sparks Fire, Gutting Five Rented Houses on Jalan Kayu Tinggi

    access_time17-07-2026 remove_red_eye947 personNurito
  4. Rano Challenges Jakarta Provoke Organizers to Hold Exhibition Along Sudirman-Thamrin

    access_time18-07-2026 remove_red_eye944 personBudhi Firmansyah Surapati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye847 personDessy Suciati