You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Depo Sampah Waduk Cincin Masuki Tahap Perencanaan

Waste Depot Construction in Cincin Reservoir Has Entered Planning Stage

The eco-friendly waste depot construction in Cincin Reservoir area, Papanggo Urban Village, Tanjung Priok, North Jakarta has entered planning consultation stage.

Right now it has entered planning consultation stage prior to auction process

North Jakarta Environment Sub-agency Head, Slamet Riyadi added that it would be built on a 1,600-square-meter width land by spending Rp 3 billion.

Koja Eco-Friendly Waste Depot Operated

"Right now it has entered planning consultation stage prior to auction process. Hopefully it can be realized by the end of this year," he expressed, Wednesday (2/27).

According to eco-friendly concept, the depot will be completed with various facilities such as, installation of wastewater treatment plant (IPAL), processing of waste organic, inorganic and composter.

"Its concept is 3 R (reuse, reduce, and recycle). So later not all waste is disposed to Bantar Gebang, as sorting has been done," he stated.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5510 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4645 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1848 personTiyo Surya Sakti
  4. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye843 personAldi Geri Lumban Tobing
  5. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye732 personAldi Geri Lumban Tobing