You don't have javascript enabled. Good luck with that.
Pencarian
 PD Pal Temukan Sampah Kabel Penyebab Luapan Air Limbah di Jalan Denpasar

PD PAL Jaya Still Handles Blockage of Sewage Pipeline at Jalan Denpasar

City-owned sewerage company PD PAL Jaya, finally found the cause of the blockage of the sewage pipeline at Jalan Denpasar, Setiabudi, South Jakarta. It was caused by cable piles that clog its flow.

We had difficulties to pick up the cable from a pipe but we could handle it gradually

PD PAL Jaya Operation and Maintenance Manager, Adri Potianti said that his ranks received the report on July 2, 2019 and immediately came to the location. 

"We had difficulties to pick up the cable from a pipe but we could handle it gradually," he expressed, Wednesday (7/17). 

PD. PAL Builds Centralized Sewage Piping Network on Jalan Gatot Subroto

To pick up it, a rodding equipment sent to the location. But now it was still in the handling. 

"We're also cooperate with the Environment Agency to optimize our work," he said.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1576 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1437 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1301 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1094 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye965 personDessy Suciati