You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Rupom Bulak Cabe Ditarget Rampung Desember
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

December, Bulak Cabe Pump House Construction Finished

We will operate this pump house in 2020

The Bulak Cabe Pump House construction in Cilincing Urban Village is targeted to be completed in the upcoming December. 

December, BGR Pump House Construction Finished

This pump house has two pumps with a capacity of 3,500 liters per second and two mud pumps with a capacity of 500 liters per second.

"We will operate this pump house in 2020," said North Jakarta Water Resources Sub-agency Head, Adrian Mara Maulana, Saturday (8/10). 

Its construction also includes long storage sheetpile construction as long as one kilometer. 

Eventually the pump house would draw water from the Cakung Lama River towards the Cakung Drain River to flow into the ocean.

"Hopefully its existence is able to minimize puddles from the river," he hoped.

Linked News
Popular News indeks
  1. MSMEs Bazaar Held at Binus Anggrek Campus

    access_time30-10-2024 remove_red_eye950 personTP Moan Simanjuntak
  2. Second Pilkada 2024 Debate Theme Set, Don't Miss It

    access_time26-10-2024 remove_red_eye776 personAldi Geri Lumban Tobing
  3. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye637 personBudhi Firmansyah Surapati
  4. Satpol PP Expels Illegal Participants at Sudirman - Thamrin CFD

    access_time27-10-2024 remove_red_eye454 personBudhi Firmansyah Surapati
  5. South Jakarta City Government Accelerates Stop BABS

    access_time31-10-2024 remove_red_eye392 personTiyo Surya Sakti
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2024 All Rights Reserved