You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Rupom Bulak Cabe Ditarget Rampung Desember

December, Bulak Cabe Pump House Construction Finished

We will operate this pump house in 2020

The Bulak Cabe Pump House construction in Cilincing Urban Village is targeted to be completed in the upcoming December. 

December, BGR Pump House Construction Finished

This pump house has two pumps with a capacity of 3,500 liters per second and two mud pumps with a capacity of 500 liters per second.

"We will operate this pump house in 2020," said North Jakarta Water Resources Sub-agency Head, Adrian Mara Maulana, Saturday (8/10). 

Its construction also includes long storage sheetpile construction as long as one kilometer. 

Eventually the pump house would draw water from the Cakung Lama River towards the Cakung Drain River to flow into the ocean.

"Hopefully its existence is able to minimize puddles from the river," he hoped.

Linked News
Popular News indeks
  1. Jakarta Endorses New Housing Project for Residents on Railway Embankments

    access_time28-03-2026 remove_red_eye2399 personDessy Suciati
  2. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye782 personTiyo Surya Sakti
  3. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye692 personDessy Suciati
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye628 personTiyo Surya Sakti
  5. Jakarta Environmental Sub-agency Clears Trash Buildup at Kramat Jati Wholesale Market

    access_time28-03-2026 remove_red_eye460 personNurito
KONTAK KAMI
Berita Jakarta Berita Jakarta TV

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved