You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Rupom Bulak Cabe Ditarget Rampung Desember

December, Bulak Cabe Pump House Construction Finished

We will operate this pump house in 2020

The Bulak Cabe Pump House construction in Cilincing Urban Village is targeted to be completed in the upcoming December. 

December, BGR Pump House Construction Finished

This pump house has two pumps with a capacity of 3,500 liters per second and two mud pumps with a capacity of 500 liters per second.

"We will operate this pump house in 2020," said North Jakarta Water Resources Sub-agency Head, Adrian Mara Maulana, Saturday (8/10). 

Its construction also includes long storage sheetpile construction as long as one kilometer. 

Eventually the pump house would draw water from the Cakung Lama River towards the Cakung Drain River to flow into the ocean.

"Hopefully its existence is able to minimize puddles from the river," he hoped.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye736 personBudhi Firmansyah Surapati
  2. BPBD Prepares 403 Evacuation Sites to Mitigate Floods in Jakarta

    access_time08-11-2026 remove_red_eye488 personBudhi Firmansyah Surapati
  3. Pramono Launches JEKATE Running 2026, Promotes Healthy Living

    access_time08-11-2026 remove_red_eye484 personDessy Suciati
  4. Tourism and Creative Economy Boost Jakarta's Economic Growth

    access_time08-11-2026 remove_red_eye451 personDessy Suciati
  5. BI and Jakarta Government Deepen Investment, Creative Economy Collaboration

    access_time09-11-2026 remove_red_eye451 personAldi Geri Lumban Tobing
KONTAK KAMI
Berita Jakarta Berita Jakarta TV

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved