You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Rupom Bulak Cabe Ditarget Rampung Desember
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

December, Bulak Cabe Pump House Construction Finished

We will operate this pump house in 2020

The Bulak Cabe Pump House construction in Cilincing Urban Village is targeted to be completed in the upcoming December. 

December, BGR Pump House Construction Finished

This pump house has two pumps with a capacity of 3,500 liters per second and two mud pumps with a capacity of 500 liters per second.

"We will operate this pump house in 2020," said North Jakarta Water Resources Sub-agency Head, Adrian Mara Maulana, Saturday (8/10). 

Its construction also includes long storage sheetpile construction as long as one kilometer. 

Eventually the pump house would draw water from the Cakung Lama River towards the Cakung Drain River to flow into the ocean.

"Hopefully its existence is able to minimize puddles from the river," he hoped.

Linked News
Popular News indeks
  1. Duren Sawit PTSP Holds Door-to-Door Services at Pondok Kelapa TPU until Thursday

    access_time15-05-2024 remove_red_eye854 personNurito
  2. QRIS User in Jakarta Keeps Growing

    access_time20-05-2024 remove_red_eye734 personAldi Geri Lumban Tobing
  3. Jakarta Coastal Residents Urged to Be Aware of Tidal Wave

    access_time20-05-2024 remove_red_eye568 personAldi Geri Lumban Tobing
  4. Nine Firetrucks Extinguish Fire in Sumur Batu

    access_time20-05-2024 remove_red_eye475 personBudhi Firmansyah Surapati
  5. Seribu Islands Parekraf Holds Creative Economy Development

    access_time18-05-2024 remove_red_eye440 personAnita Karyati
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2024 All Rights Reserved