You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Rupom Bulak Cabe Ditarget Rampung Desember

December, Bulak Cabe Pump House Construction Finished

We will operate this pump house in 2020

The Bulak Cabe Pump House construction in Cilincing Urban Village is targeted to be completed in the upcoming December. 

December, BGR Pump House Construction Finished

This pump house has two pumps with a capacity of 3,500 liters per second and two mud pumps with a capacity of 500 liters per second.

"We will operate this pump house in 2020," said North Jakarta Water Resources Sub-agency Head, Adrian Mara Maulana, Saturday (8/10). 

Its construction also includes long storage sheetpile construction as long as one kilometer. 

Eventually the pump house would draw water from the Cakung Lama River towards the Cakung Drain River to flow into the ocean.

"Hopefully its existence is able to minimize puddles from the river," he hoped.

Linked News
Popular News indeks
  1. Kelapa Gading-Manggarai LRT Serves 100,343 Passengers

    access_time26-09-2026 remove_red_eye499 personAldi Geri Lumban Tobing
  2. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye477 personAldi Geri Lumban Tobing
  3. Jaksinema Encouraged to Become Market Economy Driver

    access_time26-09-2026 remove_red_eye455 personFakhrizal Fakhri
  4. Buildings on the Sidewalk in Front of Plumpang Transjakarta Bus Stop Demolished

    access_time30-09-2026 remove_red_eye395 personAnita Karyati
  5. Jakarta Penuh Warna Edition 3 Highlights Harmony in Diversity

    access_time27-09-2026 remove_red_eye306 personAldi Geri Lumban Tobing
KONTAK KAMI
Berita Jakarta Berita Jakarta TV

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved