You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Rupom Bulak Cabe Ditarget Rampung Desember
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

December, Bulak Cabe Pump House Construction Finished

We will operate this pump house in 2020

The Bulak Cabe Pump House construction in Cilincing Urban Village is targeted to be completed in the upcoming December. 

December, BGR Pump House Construction Finished

This pump house has two pumps with a capacity of 3,500 liters per second and two mud pumps with a capacity of 500 liters per second.

"We will operate this pump house in 2020," said North Jakarta Water Resources Sub-agency Head, Adrian Mara Maulana, Saturday (8/10). 

Its construction also includes long storage sheetpile construction as long as one kilometer. 

Eventually the pump house would draw water from the Cakung Lama River towards the Cakung Drain River to flow into the ocean.

"Hopefully its existence is able to minimize puddles from the river," he hoped.

Linked News
Popular News indeks
  1. Pramono Prioritizes Construction of Cakung Regional Hospital

    access_time18-04-2025 remove_red_eye468 personFakhrizal Fakhri
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye406 personBudhi Firmansyah Surapati
  3. Free Transportation Services to Facilitate Residents' Mobility

    access_time17-04-2025 remove_red_eye316 personDessy Suciati
  4. Jakarta to Make Public Transportation Free on April 24, 2025

    access_time18-04-2025 remove_red_eye311 personAldi Geri Lumban Tobing
  5. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye279 personFakhrizal Fakhri
KONTAK KAMI

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2025 All Rights Reserved

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik