You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Rupom Bulak Cabe Ditarget Rampung Desember

December, Bulak Cabe Pump House Construction Finished

We will operate this pump house in 2020

The Bulak Cabe Pump House construction in Cilincing Urban Village is targeted to be completed in the upcoming December. 

December, BGR Pump House Construction Finished

This pump house has two pumps with a capacity of 3,500 liters per second and two mud pumps with a capacity of 500 liters per second.

"We will operate this pump house in 2020," said North Jakarta Water Resources Sub-agency Head, Adrian Mara Maulana, Saturday (8/10). 

Its construction also includes long storage sheetpile construction as long as one kilometer. 

Eventually the pump house would draw water from the Cakung Lama River towards the Cakung Drain River to flow into the ocean.

"Hopefully its existence is able to minimize puddles from the river," he hoped.

Linked News
Popular News indeks
  1. Pramono Flags Off 10,000 Runners at Soekarno Run 2026

    access_time15-02-2026 remove_red_eye1057 personFolmer
  2. Jakarta Unveils Indonesia’s First SDGs Corner at Maritime Museum

    access_time15-02-2026 remove_red_eye993 personNurito
  3. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye965 personAldi Geri Lumban Tobing
  4. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye925 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye705 personAldi Geri Lumban Tobing
KONTAK KAMI
Berita Jakarta Berita Jakarta TV

Jl. Medan Merdeka Selatan 8-9 Blok F Lt. II Jakarta
local_phone +62 21 3822356
email redaksi@beritajakarta.id

TAUTAN LAINNYA
Tentang Kami | Sitemap | Infografis

© copyright 2001 - 2026 All Rights Reserved