You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Saluran Phb Kayu Putih Dimulai
.
photo Nurito - Beritajakarta.id

Kayu Putih Sheet Pile in Pulogadung Repaired

This sheet pile is repaired after being crushed by high water flow

The East Jakarta Water Resources Sub-agency targets to finish the repair of the Kayu Putih connecting channel's sheet Pile, Pulogadung in the forthcoming December. It has been carried out since September 12.

"This sheet pile is repaired after being crushed by high water flow," said East Jakarta Water Resources Sub-agency Head, Santo, Wednesday (10/2).

Sheet Pile Installation on Sentiong River Has Reached 23 Percent

Technically it is done from the Sunter River until Kampung Ambon, Kayu Putih as long as 2.5 kilometers.

To speed up it, three heavy equipments type backhoe for excavating land and 300 personnel have been deployed to the location.

"We use river rocks to repair for long durability," he stated.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye716 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye603 personFolmer
  3. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye287 personBudhi Firmansyah Surapati
  4. Transjakarta Ready to Support People's Mobility This Eid

    access_time30-03-2025 remove_red_eye253 personAldi Geri Lumban Tobing
  5. S. Jakarta Transportation Sub-agency Optimizes Services at Tourist Spots

    access_time03-04-2025 remove_red_eye247 personTiyo Surya Sakti

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik