You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Turap Saluran Phb Kayu Putih Dimulai
.
photo Nurito - Beritajakarta.id

Kayu Putih Sheet Pile in Pulogadung Repaired

This sheet pile is repaired after being crushed by high water flow

The East Jakarta Water Resources Sub-agency targets to finish the repair of the Kayu Putih connecting channel's sheet Pile, Pulogadung in the forthcoming December. It has been carried out since September 12.

"This sheet pile is repaired after being crushed by high water flow," said East Jakarta Water Resources Sub-agency Head, Santo, Wednesday (10/2).

Sheet Pile Installation on Sentiong River Has Reached 23 Percent

Technically it is done from the Sunter River until Kampung Ambon, Kayu Putih as long as 2.5 kilometers.

To speed up it, three heavy equipments type backhoe for excavating land and 300 personnel have been deployed to the location.

"We use river rocks to repair for long durability," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye946 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye929 personFolmer
  4. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye799 personBudhi Firmansyah Surapati
  5. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye769 personAldi Geri Lumban Tobing