You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan IPAL di Pulau Harapan Capai 40 Persen
.
photo Suparni - Beritajakarta.id

Harapan Island IPAL Construction Reaches 40 Percent

Process of Wastewater Treatment Plant (IPAL) construction at RT 01/01 Harapan Island Urban Island, North Thousand Islands has reached 40 percent.

IPAL construction that is built with budget Rp 12.9 billion is targeted to complete on December 15

Thousand Islands Water Resources (SDA) Sub-department Head, Mustajab conveyed, this IPAL can accommodate domestic wastewater from two RWs in Harapan Island with total channel capacity to reach 500 houses.

"IPAL construction that is built with budget Rp 12.9 billion is targeted to complete on December 15," he stated, Thursday (10/31).

Tanjung Duren Locals Collaborate with Abdi Rakyat to Develop IPAL

Harapan Island Urban Village Secretary, Irfan Damanhuri explained, IPAL will be used to manage domestic wastewater in the region thus it could reduce groundwater and sea water pollution.

"If it is managed properly, wastewater that flows into the sea is already clean thus it doesn't pollute the environment," he explained.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye397 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye354 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik