You don't have javascript enabled. Good luck with that.
Pencarian
MRT Fase II Mulai Digarap, PT MRT Jakarta Targetkan 500 Ribu Penumpang Perhari

MRT Phase II Targets 500 Thousand Passengers Per Day

Mass Rapid Train (MRT) Phase II that connects Hotel Indonesia (HI) Raundbout to Ancol Barat is targeted to transport 500 thousand passengers per day when it is operated.

We are targeting 500 thousand passengers because it has large coverage and longer route

"That target is quite realistic because MRT Phase II has a longer route from Lebak Bulus to Ancol Barat," conveyed PT. MRT Jakarta President Director, William Sabandar, Monday (11/11).

Moreover, MRT Phase II route passes through densely populated areas, tourist sites, and business economic centers.

MRT Phase II Depot Location Being Reviewed

"Besides, from its operational and punctuality, we can ensure this transport is almost 100 percent perfect. It becomes very reliable and long-awaited by the public," he mentioned, while explaining about current process of MRT Phase II that has entered auction stage.

Linked News
Popular News indeks
  1. Hosted in Sydney, Pramono Discusses Opening Australian Campuses in Jakarta

    access_time25-11-2026 remove_red_eye822 personDessy Suciati
  2. Transjakarta Extends Operating Hours for MCR Concert at JIS

    access_time22-11-2026 remove_red_eye668 personAldi Geri Lumban Tobing
  3. Pasar Baru Festival 2026 Brings Historic District to Life

    access_time27-11-2026 remove_red_eye506 personFolmer
  4. Meet Boan, A Retired Teacher Crafting Traditional Betawi Masks

    access_time22-11-2026 remove_red_eye490 personNurito
  5. Jakarta Tops Teqball at 2026 PON Beach Games

    access_time27-11-2026 remove_red_eye444 personAldi Geri Lumban Tobing