You don't have javascript enabled. Good luck with that.
Pencarian
 Kelurahan Cipinang Cempedak Siapkan 15 Sumur Resapan

Construction of Infiltration Wells in Cipinang Cempedak Reaches 70 Percent

Cipinang Cempedak Urban Village Head, Ika Yuli Rahayu stated, this construction is to realize the Governor Instruction about vertical drainage.

All wells are targeted to finish by this weekend

"Infiltration well is constructed not only to anticipate inundation, but also to supply clean water during dry season," she mentioned, Wednesday (11/13).

Those 15 infiltration wells are built in urban village offices, RPTRAs, and settlements.

South Jakarta SDA Targets to Build 500 Infiltration Wells This Year

In details, 2 units are built in urban village office, 2 units are in Wangi Cempedak RPTRA and 1 unit is in each 11 RWs of Cipinang Urban Village.

Especially for wells in RTPRA and settlements are made in round shape with a diameter of 1.3 meters and a depth of 2 meters. While in urban village is made in rectangle shape in the size of 1x2 meters and depth of 2 meters.

"All wells are targeted to finish by this weekend," she informed.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye868 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye355 personAldi Geri Lumban Tobing
close