You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Jembatan Orang di Kayu Putih Capai 48 Persen

Bridge Construction in Kayu Putih Targets for December

The bridge development in Kayu Putih Urban Village and Rawamangun Urban Village, Pulogadung Sub-district, East Jakarta has touched 48 percent.

We have entered the steel beam installation stage

This bridge as long as 15.5 meters with 1.75 meters width is only for access by citizens on foot, instead of the motorized vehicles.

"We have entered the steel beam installation stage and is targeted for completion in early December," expressed East Jakarta Bina Marga Sub-department Head, Muhammad Soleh, Thursday (11/14).

Bina Marga Repairs Damaged JPOs Due to Electric Scooter

Kayu Putih Urban Village Head Artika Ristiana uttered the bridge is made as a follow up to the citizens' proposal in such villages through the Musrenbang.

"It is built to facilitate locals from RW 05 Rawamangun towards Jalan Bangunan Timur Raya, Kayu Putih or vice versa," she told.

Linked News
Popular News indeks
  1. Jakarta Coastal Areas on Alert for Possible Tidal Flood

    access_time11-02-2026 remove_red_eye799 personAldi Geri Lumban Tobing
  2. Mark Your Calendars: Jakarta’s Lunar New Year 2026 Lineup is Here!

    access_time11-02-2026 remove_red_eye554 personAldi Geri Lumban Tobing
  3. 120 Joint Officers Ready to Guard Milkfish Festival 2026

    access_time13-02-2026 remove_red_eye501 personBudhi Firmansyah Surapati
  4. Jakarta and BGN Ink Strategic Deal for Free Nutritious Meals

    access_time10-02-2026 remove_red_eye493 personDessy Suciati
  5. Pramono Calls on Residents to Maintain Peace and Harmony During Ramadan

    access_time14-02-2026 remove_red_eye471 personFakhrizal Fakhri