You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Jembatan Orang di Kayu Putih Capai 48 Persen
.
photo Nurito - Beritajakarta.id

Bridge Construction in Kayu Putih Targets for December

The bridge development in Kayu Putih Urban Village and Rawamangun Urban Village, Pulogadung Sub-district, East Jakarta has touched 48 percent.

We have entered the steel beam installation stage

This bridge as long as 15.5 meters with 1.75 meters width is only for access by citizens on foot, instead of the motorized vehicles.

"We have entered the steel beam installation stage and is targeted for completion in early December," expressed East Jakarta Bina Marga Sub-department Head, Muhammad Soleh, Thursday (11/14).

Bina Marga Repairs Damaged JPOs Due to Electric Scooter

Kayu Putih Urban Village Head Artika Ristiana uttered the bridge is made as a follow up to the citizens' proposal in such villages through the Musrenbang.

"It is built to facilitate locals from RW 05 Rawamangun towards Jalan Bangunan Timur Raya, Kayu Putih or vice versa," she told.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye557 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye451 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti