You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Jembatan Orang di Kayu Putih Capai 48 Persen

Bridge Construction in Kayu Putih Targets for December

The bridge development in Kayu Putih Urban Village and Rawamangun Urban Village, Pulogadung Sub-district, East Jakarta has touched 48 percent.

We have entered the steel beam installation stage

This bridge as long as 15.5 meters with 1.75 meters width is only for access by citizens on foot, instead of the motorized vehicles.

"We have entered the steel beam installation stage and is targeted for completion in early December," expressed East Jakarta Bina Marga Sub-department Head, Muhammad Soleh, Thursday (11/14).

Bina Marga Repairs Damaged JPOs Due to Electric Scooter

Kayu Putih Urban Village Head Artika Ristiana uttered the bridge is made as a follow up to the citizens' proposal in such villages through the Musrenbang.

"It is built to facilitate locals from RW 05 Rawamangun towards Jalan Bangunan Timur Raya, Kayu Putih or vice versa," she told.

Linked News
Popular News indeks
  1. Kelapa Gading-Manggarai LRT Serves 100,343 Passengers

    access_time26-09-2026 remove_red_eye498 personAldi Geri Lumban Tobing
  2. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye476 personAldi Geri Lumban Tobing
  3. Jaksinema Encouraged to Become Market Economy Driver

    access_time26-09-2026 remove_red_eye455 personFakhrizal Fakhri
  4. Buildings on the Sidewalk in Front of Plumpang Transjakarta Bus Stop Demolished

    access_time30-09-2026 remove_red_eye393 personAnita Karyati
  5. Jakarta Penuh Warna Edition 3 Highlights Harmony in Diversity

    access_time27-09-2026 remove_red_eye305 personAldi Geri Lumban Tobing