You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Jembatan Orang di Kayu Putih Capai 48 Persen

Bridge Construction in Kayu Putih Targets for December

The bridge development in Kayu Putih Urban Village and Rawamangun Urban Village, Pulogadung Sub-district, East Jakarta has touched 48 percent.

We have entered the steel beam installation stage

This bridge as long as 15.5 meters with 1.75 meters width is only for access by citizens on foot, instead of the motorized vehicles.

"We have entered the steel beam installation stage and is targeted for completion in early December," expressed East Jakarta Bina Marga Sub-department Head, Muhammad Soleh, Thursday (11/14).

Bina Marga Repairs Damaged JPOs Due to Electric Scooter

Kayu Putih Urban Village Head Artika Ristiana uttered the bridge is made as a follow up to the citizens' proposal in such villages through the Musrenbang.

"It is built to facilitate locals from RW 05 Rawamangun towards Jalan Bangunan Timur Raya, Kayu Putih or vice versa," she told.

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1062 personFolmer
  2. Low Emission Zones: Jakarta’s Concrete Step to Curb Air Pollution

    access_time13-04-2026 remove_red_eye894 personAldi Geri Lumban Tobing
  3. Jakpro Promotes Integration Between JIS and KRL Station

    access_time10-04-2026 remove_red_eye838 personAldi Geri Lumban Tobing
  4. Cilandak Health Center Maintains Optimal Services

    access_time10-04-2026 remove_red_eye807 personTiyo Surya Sakti
  5. Palmeriam Market Adopts QRIS Digital Payment System

    access_time08-04-2026 remove_red_eye704 personNurito