You don't have javascript enabled. Good luck with that.
Pencarian
 Progres Pengerjaan Pengerukan Saluran Jalan Kali Pasir Capai 50 Persen

Channel Dredging on Jalan Kali Pasir Has Touched 50 Percent

Hopefully it can minimize inundation optimally when it rains

The Menteng Sub-district Water Resources (SDA) Executing Unit, Central Jakarta reports the water channel dredging on Jalan Kali Pasir, RW 08, Cikini Urban Village has touched 50 percent.

"This work that has been carried out since November 7 aims to minimize inundation," he expressed Menteng Sub-district SDA Executing Unit Head, Yopi Siregar, Monday (11/18).

Channel on Jalan Petojo Barat Normalized

It will be dredged up to 20 meters length in conjunction with the installation of the channel's manhole cover.

"The process has reached 10 meters and is targeted to be complete next week," he explained.

In addition, his side picked up 2 cubic meters of mud and waste from the channel.

"To do it, we have eight personnel in the field. Hopefully it can minimize inundation optimally when it rains," he stated.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1082 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye506 personDessy Suciati
  3. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye467 personBudhi Firmansyah Surapati
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye467 personAldi Geri Lumban Tobing
  5. Setu Babakan Presents Arts and Culture Extravaganza to Mark Jakarta Anniversary

    access_time20-06-2026 remove_red_eye434 personNurito