You don't have javascript enabled. Good luck with that.
Pencarian
Seluruh Rumah Pompa di Kebayoran Lama Berfungsi Optimal

All Pump Houses in Kebayoran Lama Ready to Anticipate Flooding

There are currently six pump houses with 16 pumps ready to minimize inundation

The Kebayoran Lama Sub-district Head Aroman says all pump houses in his region are in good condition and ready to face the rainy season.

"There are currently six pump houses with 16 pumps ready to minimize flooding. Each has a capacity of 60 liters per second, 100 liters per second, 250 liters per second up to 500 liters per second," he expressed, (11/19).

Bulak Cabe Pump House Construction Reaches 60 Percent

Those six pumps are in Kebayoran Lama Under pass (four pumps), Bungur Underpass (four pumps), Jalan Muhi 8 (three pumps), Jalan Muhi 2 (two pumps), Lemigas Housing Complex (one pump) and TVRI Complex area (two pumps).

"Another one type mobile pump is in front of Gandaria City belongs to the Water Resources Agency," he told.

Linked News
Popular News indeks
  1. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye777 personAldi Geri Lumban Tobing
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye661 personTiyo Surya Sakti
  3. Jakarta Residents Welcome Rp1 Public Transport Fare

    access_time24-04-2026 remove_red_eye569 personNurito
  4. Limiting Gadget Use in Schools Expected to Boost Interaction and Reading Habits

    access_time24-04-2026 remove_red_eye550 personFakhrizal Fakhri
  5. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye547 personBudhi Firmansyah Surapati