You don't have javascript enabled. Good luck with that.
Pencarian
Seluruh Rumah Pompa di Kebayoran Lama Berfungsi Optimal

All Pump Houses in Kebayoran Lama Ready to Anticipate Flooding

There are currently six pump houses with 16 pumps ready to minimize inundation

The Kebayoran Lama Sub-district Head Aroman says all pump houses in his region are in good condition and ready to face the rainy season.

"There are currently six pump houses with 16 pumps ready to minimize flooding. Each has a capacity of 60 liters per second, 100 liters per second, 250 liters per second up to 500 liters per second," he expressed, (11/19).

Bulak Cabe Pump House Construction Reaches 60 Percent

Those six pumps are in Kebayoran Lama Under pass (four pumps), Bungur Underpass (four pumps), Jalan Muhi 8 (three pumps), Jalan Muhi 2 (two pumps), Lemigas Housing Complex (one pump) and TVRI Complex area (two pumps).

"Another one type mobile pump is in front of Gandaria City belongs to the Water Resources Agency," he told.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye739 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye617 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye564 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye526 personFakhrizal Fakhri
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye501 personAldi Geri Lumban Tobing