You don't have javascript enabled. Good luck with that.
Pencarian
Kabel Listrik PJU di Jakpus akan Diperbarui

Central Jakarta Bina Marga Replaces PJU's Electrical Cables

Central Jakarta Bina Marga Sub-department collects electrical installation data from public street lighting (PJU). This data will be used to replace any damaged and old cable on PJUs.

We need to replace those cables to prevent electrical short circuit

Central Jakarta Bina Marga Sub-department Head, Rakim Sastranegara mentioned, cables and other supporting devices that are not feasible should be replaced as a part of PJU maintenance.

"In total, there are 29,700 PJUs in Central Jakarta. 30 percent of them contain of old cables that should be replaced," he conveyed, Wednesday (1/29).

PE Dept. Installs PJUs with Dislocation Arms Type

He assessed, cable replacement is important to optimize street lighting service. Besides, it is also important for people's safety because there are 10 year old cables on several PJUs.

"We need to replace those cables to prevent electrical short circuit. With this data, we can replace infeasible cables," he said.

Linked News
Popular News indeks
  1. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye758 personBudhi Firmansyah Surapati
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye741 personAldi Geri Lumban Tobing
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye669 personDessy Suciati
  4. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye621 personAldi Geri Lumban Tobing
  5. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye601 personAldi Geri Lumban Tobing